TENDER NO.: <strong>GAIL</strong>/ND/C&P-MKTG/GT/14/2007<br />

The time schedule <strong>for</strong> design, engineering, setting up, testing and<br />

commissioning <strong>of</strong> the links/connectivity as per “Connectivity<br />

Requirement”, as mentioned else where in this document, in totality is 30<br />

days from the date <strong>of</strong> Fax <strong>of</strong> Intent (FOI).<br />

4. Contract Period<br />

The contract service period <strong>for</strong> providing required connectivity and<br />

maintaining the same as per service level agreement (SLA) will be<br />

initially <strong>for</strong> a period <strong>of</strong> two years from the date <strong>of</strong> commissioning and<br />

will be extendable <strong>for</strong> another six months on the same terms and<br />

conditions if <strong>GAIL</strong> desired to extend the contract.However, <strong>GAIL</strong><br />

reserves the right to terminate links partially or fully under the contract<br />

with notice period <strong>of</strong> one month.<br />

5. Installation:<br />

All the pre-requisites regarding site readiness has to be clearly intimated<br />

to <strong>GAIL</strong> in advance and if felt needed, Bidder can visit the sites in<br />

advance and check <strong>for</strong> the readiness <strong>for</strong> power, housing,<br />

installation/operation etc <strong>of</strong> the systems at sites.<br />

6. Installation responsibilities:<br />

Service provider will submit the installation report along with systems<br />

configuration report, results <strong>of</strong> diagnostic tests run etc to <strong>GAIL</strong>.<br />

Installation report has to be submitted by the service provider mentioning<br />

all the serial numbers <strong>of</strong> installed hardware & s<strong>of</strong>tware along with the<br />

required valid licenses if any applicable.<br />

At the end <strong>of</strong> the implementation <strong>of</strong> connectivity, while commissioning<br />

the links, the consolidated report mentioning the same needs to be<br />

submitted to EIC in the <strong>for</strong>m <strong>of</strong> hard and s<strong>of</strong>t copies.<br />

For setting up <strong>of</strong> end to end connectivity by service provider, <strong>GAIL</strong> will<br />

provide space & 230 V AC single phase, 50 Hz raw power at all the<br />

locations. Uninterrupted power supply required <strong>for</strong> hardware to be<br />

arranged by the service provider. The contact details & address <strong>of</strong> all<br />

<strong>GAIL</strong> locations, where the connectivity/ link are required to be have been<br />

mentioned at Annexure-I in this document.<br />