Section-II General In<strong>for</strong>mation<br />

2. General In<strong>for</strong>mation 2.1 a) Location <strong>of</strong> Site: The proposed location <strong>of</strong> Project site is<br />

defined in the Special Conditions <strong>of</strong> Contract.<br />

b) Access by Road: CONTRACTOR, if necessary, shall build<br />

other temporary access roads to the actual site <strong>of</strong> construction <strong>for</strong><br />

his own work at his own cost. The CONTRACTOR shall be<br />

required to permit the use <strong>of</strong> the roads so constructed by him <strong>for</strong><br />

vehicles <strong>of</strong> any other parties who may be engaged on the project<br />

site. The CONTRACTOR shall also facilitate the construction <strong>of</strong><br />

the permanent roads should the construction there <strong>of</strong> start while<br />

he is engaged on this work. He shall make allowance in his<br />

tender <strong>for</strong> any inconvenience he anticipates on such account.<br />

Non-availability <strong>of</strong> access roads, railway siding and railway<br />

wagons <strong>for</strong> the use <strong>of</strong> the CONTRACTOR shall in no case<br />

condone any delay in the execution <strong>of</strong> WORK nor be the cause<br />

<strong>for</strong> any claim <strong>for</strong> compensation against the EMPLOYER.<br />

2.2 Scope <strong>of</strong> Work: The scope <strong>of</strong> WORK is defined in the Technical<br />

Part <strong>of</strong> the tender document. The CONTRACTOR shall provide<br />

all necessary materials, equipment, labour etc. <strong>for</strong> the execution<br />

and maintenance <strong>of</strong> the WORK till completion unless otherwise<br />

mentioned in the Tender Document.<br />

2.3 Water Supply: Contractor will have to make his own arrangements<br />

<strong>for</strong> supply <strong>of</strong> water to his labour camps and <strong>for</strong> works. All<br />

pumping installations, pipe net work and distribution system will<br />

have to be carried out by the Contractor at his own cost.<br />

Alternatively the Employer at his discretion may endeavour to<br />

provide water to the Contractor at the Employer's source <strong>of</strong> supply<br />

provided the Contractor makes his own arrangement <strong>for</strong> the water<br />

meter which shall be in custody <strong>of</strong> the Employer and other pipe<br />

net works from source <strong>of</strong> supply and such distribution pipe<br />

network shall have prior approval <strong>of</strong> the Engineer-in-Charge so as<br />

not to interfere with the layout and progress <strong>of</strong> the other<br />

construction works. In such case, the rate <strong>for</strong> water shall be<br />

deducted from the running account bills.<br />

However, the Employer does not guarantee the supply <strong>of</strong> water<br />

and this does not relieve the Contractor <strong>of</strong> his responsibility in<br />

making his own arrangement and <strong>for</strong> the timely completion <strong>of</strong> the<br />

various works as stipulated.<br />

2.4 Power Supply:<br />

2.4.1 Subject to availability, EMPLOYER will supply power at<br />

400/440 V at only one point at the nearest sub-station, from<br />

where the CONTRACTOR will make his own arrangement <strong>for</strong><br />

temporary distribution. The point <strong>of</strong> supply will not be more<br />

46