04.08.2013 Views

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENGINEER-IN-CHARGE.<br />

"Certified true <strong>for</strong> ___________________________________<br />

(Name <strong>of</strong> Work)<br />

Agreement<br />

No._____________________________________________<br />

Signed:_________________<br />

_________________<br />

(CONTRACTOR) (ENGINEER-IN-CHARGE)<br />

62.3 The DRAWINGS submitted by the CONTRACTOR shall be<br />

reviewed by the ENGINEER-IN-CHARGE as far as<br />

practicable within 3 (Three) weeks and shall be modified by<br />

the CONTRACTOR, if any modifications and/or corrections<br />

are required by the ENGINEER-IN-CHARGE. The<br />

CONTRACTOR shall incorporate such modifications and/or<br />

corrections and submit the final drawings <strong>for</strong> approval. Any<br />

delays arising out <strong>of</strong> failure by the CONTRACTOR to rectify<br />

the drawing in good time shall not alter the Contract<br />

Completion Time.<br />

62.4 As built drawings showing all corrections, adjustments etc.<br />

shall be furnished by the CONTRACTOR in six copies and<br />

one transparent <strong>for</strong> record purposed to the EMPLOYER.<br />

63. Setting out works: 63.1 The ENGINEER-IN-CHARGE shall furnish the<br />

CONTRACTOR with only the four corners <strong>of</strong> the Works site<br />

and a level bench mark and the CONTRACTOR shall set out<br />

the Works and shall provide an efficient staff <strong>for</strong> the purpose<br />

and shall be solely responsible <strong>for</strong> the accuracy <strong>of</strong> such setting<br />

out.<br />

63.2 The CONTRACTOR shall provide, fix and be responsible <strong>for</strong><br />

the maintenance <strong>of</strong> all stakes, templates, level marks, pr<strong>of</strong>iles<br />

and other similar things and shall take all necessary<br />

precautions to prevent their removal or disturbance and shall<br />

be responsible <strong>for</strong> the consequence <strong>of</strong> such removal or<br />

disturbance should the same take place and <strong>for</strong> their efficient<br />

and timely reinstatement. The CONTRACTOR shall also be<br />

responsible <strong>for</strong> the maintenance <strong>of</strong> all existing survey marks,<br />

boundary marks, distance marks and center line marks, either<br />

existing or supplied and fixed by the CONTRACTOR. The<br />

work shall be set out to the satisfaction <strong>of</strong> the<br />

ENGINEER-IN-CHARGE. The approval there <strong>of</strong> joining<br />

with the CONTRACTOR by the ENGINEER- IN-CHARGE<br />

in setting out the work, shall not relieve the CONTRACTOR<br />

<strong>of</strong> any <strong>of</strong> his responsibility.<br />

63.3 Be<strong>for</strong>e beginning the Works, the CONTRACTOR shall at his<br />

85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!