04.08.2013 Views

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

68. Material procured with<br />

assistance <strong>of</strong><br />

employer/return <strong>of</strong><br />

surplus:<br />

CONTRACTOR from responsibility <strong>of</strong> making<br />

arrangements <strong>for</strong> the supply <strong>of</strong> such materials in part or<br />

in full, should such a situation occur nor shall this<br />

constitute a reason <strong>for</strong> the delay in the execution <strong>of</strong> the<br />

WORK.<br />

viii) None <strong>of</strong> the materials supplied to the CONTRACTOR<br />

will be utilised by the CONTRACTOR <strong>for</strong><br />

manufacturing item which can be obtained as supplied<br />

from standard manufacturer in finished <strong>for</strong>m.<br />

ix) The CONTRACTOR shall, if desired by the<br />

ENGINEER- IN-CHARGE, be required to execute an<br />

Indemnity Bond in the prescribed <strong>for</strong>m <strong>for</strong> safe<br />

custody and accounting <strong>of</strong> all materials issued by the<br />

EMPLOYER.<br />

x) The CONTRACTOR shall furnish to the<br />

ENGINEER-IN- CHARGE sufficiently in advance a<br />

statement showing his requirement <strong>of</strong> the quantities <strong>of</strong><br />

the materials to be supplied by the EMPLOYER and<br />

the time when the same will be required by him <strong>for</strong> the<br />

works, so as to enable the ENGINEER-IN-CHARGE<br />

to make necessary arrangements <strong>for</strong> procurement and<br />

supply <strong>of</strong> the material.<br />

xi) Account <strong>of</strong> the materials issued by the EMPLOYER<br />

shall be maintained by CONTRACTOR indicating the<br />

daily receipt, consumption and balance in hand. This<br />

account shall be maintained in a manner prescribed by<br />

the ENGINEER-IN-CHARGE along with all<br />

connected papers viz. requisitions, issues, etc., and<br />

shall be always available <strong>for</strong> inspection in the<br />

CONTRACTOR's <strong>of</strong>fice at SITE.<br />

xii) The CONTRACTOR should see that only the required<br />

quantities <strong>of</strong> materials are got issued. The<br />

CONTRACTOR shall not be entitled to cartage and<br />

incidental charges <strong>for</strong> returning the surplus materials, if<br />

any, to the stores wherefrom they were issued or to the<br />

place as directed by the ENGINEER-IN-CHARGE.<br />

xiii) Materials/Equipment(s) supplied by EMPLOYER<br />

shall not be utilised <strong>for</strong> any purpose(s) than issued <strong>for</strong>.<br />

68.1 Notwithstanding anything contained to the contrary in any or<br />

all the clauses <strong>of</strong> this CONTRACT where any materials <strong>for</strong> the<br />

execution <strong>of</strong> the CONTRACT are procured with the assistance<br />

<strong>of</strong> the EMPLOYER either by issue from EMPLOYER's stock<br />

or purchases made under order or permits or licences issued by<br />

Government, the CONTRACTOR shall hold the said materials<br />

as trustee <strong>for</strong> the EMPLOYER and use such materials<br />

89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!