117 Care in handling<br />

inflammable gas:<br />

118 Temporary combustible<br />

structures:<br />

125<br />

time to time.<br />

117.1 The CONTRACTOR has to ensure all precautionary<br />

measures and exercise utmost care in handling the<br />

inflammable gas cylinder/inflammable liquids/paints etc. as<br />

required under the law and/or as advised by the fire<br />

Authorities <strong>of</strong> the EMPLOYER<br />

118.1 Temporary combustible structures will not be built near or<br />

around work site.<br />

119 Precautions against fire: 119.1 The CONTRACTOR will have to provide Fire<br />

Extinguishers, Fire Buckets and drums at worksite as<br />

recommended by ENGINEER-IN-CHARGE. They will have<br />

to ensure all precautionary measures and exercise utmost<br />

care in handling the inflammable gas cylinders/ inflammable<br />

liquid/ paints etc. as advised by ENGINEER-IN-CHARGE.<br />

Temporary combustible structures will not be built near or<br />

around the work-site.<br />

120 Explosives: 120.1 Explosives shall not be stored or used on the WORK or on<br />

the SITE by the CONTRACTOR without the permission <strong>of</strong><br />

the ENGINEER-IN-CHARGE in writing and then only in<br />

the manner and to the extent to which such permission is<br />

given. When explosives are required <strong>for</strong> the WORK they<br />

will be stored in a special magazine to be provided at the cost<br />

<strong>of</strong> the CONTRACTOR in accordance with the Explosives<br />

Rules. The CONTRACTOR shall obtain the necessary<br />

licence <strong>for</strong> the storage and the use <strong>of</strong> explosives and all<br />

operations in which or <strong>for</strong> which explosives are employed<br />

shall be at sole risk and responsibility <strong>of</strong> the<br />

CONTRACTOR and the CONTRACTOR shall indemnify<br />

the EMPLOYER against any loss or damage resulting<br />

directly or indirectly therefrom.<br />

121 Mines act: 121.1 SAFETY CODE: The CONTRACTOR shall at his own<br />

expense arrange <strong>for</strong> the safety provisions as required by the<br />

ENGINEER-IN-CHARGE in respect <strong>of</strong> all labour directly<br />

employed <strong>for</strong> per<strong>for</strong>mance <strong>of</strong> the WORKS and shall provide<br />

all facilities in connection therewith. In case the<br />

CONTRACTOR fails to make arrangements and provides<br />

necessary facilities as a<strong>for</strong>esaid, the ENGINEER-IN-<br />

CHARGE shall be entitled to do so and recover the costs<br />

there<strong>of</strong> from the CONTRACTOR.<br />

121.2 Failure to comply with Safety Code or the provisions<br />

relating to report on accidents and to grant <strong>of</strong> maternity<br />

benefits to female workers shall make the CONTRACTOR<br />

liable to pay Company Liquidated Damages an amount not<br />

exceeding Rs.50/- <strong>for</strong> each default or materially incorrect<br />

statement. The decision <strong>of</strong> the ENGINEER-IN-CHARGE in<br />

such matters based on reports from the Inspecting Officer or