04.08.2013 Views

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Company (other than the CONTRACTOR) to whom any part <strong>of</strong><br />

the work has been entrusted by the CONTRACTOR, with the<br />

written consent <strong>of</strong> the ENGINEER-IN-CHARGE, and the legal<br />

representatives, successors and permitted assigns <strong>of</strong> such person,<br />

firm or company.<br />

1.1.10 The "CONTRACT” shall mean the Agreement between the<br />

EMPLOYER and the CONTRACTOR <strong>for</strong> the execution <strong>of</strong> the<br />

works including therein all contract documents.<br />

1.1.11 The "SPECIFICATION" shall mean all directions the various<br />

technical specifications, provisions attached and referred to the<br />

Tender Documents which pertain to the method and manner <strong>of</strong><br />

per<strong>for</strong>ming the work or works to the quantities and qualities <strong>of</strong><br />

the work or works and the materials to be furnished under the<br />

CONTRACT <strong>for</strong> the work or works, as may be amplified or<br />

modified by the <strong>GAIL</strong> or ENGINEER-IN-CHARGE during the<br />

per<strong>for</strong>mance <strong>of</strong> CONTRACT in order to provide the un<strong>for</strong>seen<br />

conditions or in the best interests <strong>of</strong> the work or works. It shall<br />

also include the latest edition <strong>of</strong> relevant Standard Specifications<br />

including all addenda/corrigenda published be<strong>for</strong>e entering into<br />

CONTRACT.<br />

1.1.12 The "DRAWINGS" shall include maps, plans and tracings or<br />

prints or sketches there<strong>of</strong> with any modifications approved in<br />

writing by the ENGINEER- IN-CHARGE and such other<br />

drawing as may, from time to time, be furnished or approved in<br />

writing by the ENGINEER-IN-CHARGE.<br />

1.1.13 The "TENDER" means the proposal along with supporting<br />

documents submitted by the CONTRACTOR <strong>for</strong> consideration<br />

by the EMPLOYER.<br />

1.1.14 The "CHANGE ORDER" means an order given in writing by<br />

the ENGINEER-IN-CHARGE to effect additions to or deletion<br />

from and alteration in the works.<br />

1.1.15 The "COMPLETION CERTIFICATE" shall mean the<br />

certificate to be issued by the ENGINEER-IN-CHARGE when<br />

the works have been completed entirely in accordance with<br />

CONTRACT DOCUMENT to his satisfaction.<br />

1.1.16 The "FINAL CERTIFICATE" in relation to a work means the<br />

certificate regarding the satisfactory compliance <strong>of</strong> various<br />

provision <strong>of</strong> the CONTRACT by the CONTRACTOR issued by<br />

the ENGINEER-IN- CHARGE/EMPLOYER after the period <strong>of</strong><br />

liability is over.<br />

1.1.17 “DEFECT LIABILITY PERIOD” in relation to a work means<br />

the specified period from the date <strong>of</strong> COMPLETION<br />

CERTIFICATE upto the date <strong>of</strong> issue <strong>of</strong> FINAL<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!