77. Suspension <strong>of</strong> works:<br />
78. Employer may do part <strong>of</strong><br />
work:<br />
79. Possession prior to<br />
completion:<br />
WORK or remove and replaced with others, the materials or<br />
articles complained <strong>of</strong> to as the case may be at the risk and<br />
expense in all respects <strong>of</strong> the CONTRACTOR. The decision<br />
<strong>of</strong> the Engineering-in-charge as to any question arising under<br />
this clause shall be final and conclusive.<br />
77.1 i) Subject to the provisions <strong>of</strong> sub-para (ii) <strong>of</strong> this clause,<br />
the CONTRACTOR shall, if ordered in writing by the<br />
ENGINEER-IN-CHARGE, or his representative,<br />
temporarily suspend the WORKS or any part there<strong>of</strong><br />
<strong>for</strong> such written order, proceed with the WORK<br />
therein ordered to be suspended until, he shall have<br />
received a written order to proceed therewith. The<br />
CONTRACTOR shall not be entitled to claim<br />
compensation <strong>for</strong> any loss or damage sustained by him<br />
by reason <strong>of</strong> temporary suspension <strong>of</strong> the WORKS<br />
a<strong>for</strong>esaid. An extension <strong>of</strong> time <strong>for</strong> completion,<br />
corresponding with the delay caused by any such<br />
suspension <strong>of</strong> the WORKS as a<strong>for</strong>esaid will be granted<br />
to the CONTRACTOR should he apply <strong>for</strong> the same<br />
provided that the suspension was not consequent to<br />
any default or failure on the part <strong>of</strong> the<br />
CONTRACTOR.<br />
ii) In case <strong>of</strong> suspensions <strong>of</strong> entire WORK, ordered in<br />
writing by ENGINEER-IN-CHARGE, <strong>for</strong> a period <strong>of</strong><br />
more than two months, the CONTRACTOR shall<br />
93<br />
have the option to terminate the CONTRACT.<br />
78.1 Upon failure <strong>of</strong> the CONTRACTOR to comply with any<br />
instructions given in accordance with the provisions <strong>of</strong> this<br />
CONTRACT the EMPLOYER has the alternative right,<br />
instead <strong>of</strong> assuming charge <strong>of</strong> entire WORK, to place<br />
additional labour <strong>for</strong>ce, tools, equipments and materials on<br />
such parts <strong>of</strong> the WORK, as the EMPLOYER may designate<br />
or also engage another CONTRACTOR to carry out the<br />
WORK. In such cases, the EMPLOYER shall deduct from the<br />
amount which otherwise might become due to the<br />
CONTRACTOR, the cost <strong>of</strong> such work and material with ten<br />
percent (10%) added to cover all departmental charges and<br />
should the total amount there<strong>of</strong> exceed the amount due to the<br />
CONTRACTOR,the CONTRACTOR shall pay the difference<br />
to the EMPLOYER.<br />
79.1 The ENGINEER-IN-CHARGE shall have the right to take<br />
possession <strong>of</strong> or use any completed or partially completed<br />
WORK or part <strong>of</strong> the WORK. Such possession or use shall<br />
not be deemed to be an acceptance <strong>of</strong> any work completed in<br />
accordance with the CONTRACT agreement. If such<br />
prior possession or use by the ENGINEER-IN- CHARGE<br />
delays the progress <strong>of</strong> WORK, equitable adjustment in the<br />
time <strong>of</strong> completion will be made and the CONTRACT<br />
agreement shall be deemed to be modified accordingly.<br />
80. (Defects liability period) 80.1 The CONTRACTOR shall guarantee the installation/WORK