26. Force Majeure:<br />

construction time after tenders are opened will not receive<br />

consideration. The above period <strong>of</strong> fifteen (15) days is<br />

included within the overall COMPLETION SCHEDULE,<br />

not over and above the completion time to any additional<br />

work or any other reasons.<br />

25.2 Time Schedule <strong>of</strong> Construction:<br />

25.2.1 The general Time Schedule <strong>of</strong> construction is given in the<br />

TENDER DOCUMENT. CONTRACTOR should prepare<br />

a detailed monthly or weekly construction program jointly<br />

with the ENGINEER-IN-CHARGE within 15 days <strong>of</strong><br />

receipt <strong>of</strong> LETTER/FAX OF INTENT or ACCEPTANCE<br />

OF TENDER. The WORK shall be executed strictly as per<br />

the Time Schedule given in the CONTRACT<br />

DOCUMENT. The period <strong>of</strong> construction given includes<br />

the time required <strong>for</strong> mobilisation testing, rectifications, if<br />

any, retesting and completion in all respects in accordance<br />

with CONTRACT DOCUMENT to the entire satisfaction<br />

<strong>of</strong> the ENGINEER-IN-CHARGE.<br />

25.2.2 The CONTRACTOR shall submit a detailed PERT network<br />

within the time frame agreed above consisting <strong>of</strong> adequate<br />

number <strong>of</strong> activities covering various key phases <strong>of</strong> the<br />

WORK such as design, procurement, manufacturing,<br />

shipment and field erection activities within fifteen (15)<br />

days from the date <strong>of</strong> LETTER/FAX OF INTENT. This<br />

network shall also indicate the interface facilities to be<br />

provided by the EMPLOYER and the dates by which such<br />

facilities are needed.<br />

25.2.3 CONTRACTOR shall discuss the network so submitted with<br />

the EMPLOYER and the agreed network which may be in<br />

the <strong>for</strong>m as submitted with the EMPLOYER or in revised<br />

<strong>for</strong>m in line with the outcome <strong>of</strong> discussions shall <strong>for</strong>m part<br />

<strong>of</strong> the CONTRACT, to be signed within fifteen (15) days<br />

from the date <strong>of</strong> LETTER OF ACCEPTANCE OF<br />

TENDER. During the per<strong>for</strong>mance <strong>of</strong> the CONTRACT, if<br />

in the opinion <strong>of</strong> the EMPLOYER proper progress is not<br />

maintained suitable changes shall be made in the<br />

CONTRACTOR's operation to ensure proper progress.<br />

The above PERT network shall be reviewed periodically<br />

and reports shall be submitted by the CONTRACTOR as<br />

directed by EMPLOYER.<br />

26.1 CONDITIONS FOR FORCE MAJEURES<br />

In the event <strong>of</strong> either party being rendered unable by Force<br />

Majeure to per<strong>for</strong>m any obligations required to be<br />

per<strong>for</strong>med by them under the CONTRACT the relative<br />

62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!