04.08.2013 Views

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

may be extended <strong>for</strong> the part <strong>of</strong> the particular job at the<br />

discretion <strong>of</strong> the ENGINEER-IN- CHARGE, <strong>for</strong> only such<br />

alterations, additions or substitutions <strong>of</strong> the WORK, as he<br />

may consider as just and reasonable. The rates <strong>for</strong> such<br />

additional, altered or substituted WORK under this clause<br />

shall be worked out in accordance with the following<br />

provisions:-<br />

I. For Item Rate Contract<br />

a) If the rates <strong>for</strong> the additional, altered or substituted<br />

WORK are specified in the CONTRACT <strong>for</strong> the<br />

WORK, the CONTRACTOR is bound to carry on<br />

the additional, altered or substituted WORK at the<br />

same rates as are specified in the CONTRACT.<br />

b) If the rates <strong>for</strong> the additional, altered or substituted<br />

WORK are not specifically provided in the<br />

CONTRACT <strong>for</strong> the WORK, the rates will be<br />

derived from the rates <strong>for</strong> similar class <strong>of</strong> WORK as<br />

are specified in the CONTRACT <strong>for</strong> the WORK.<br />

The opinion <strong>of</strong> the ENGINEER-IN- CHARGE, as<br />

to whether or not the rates can be reasonably so<br />

derived from the items in this CONTRACT will be<br />

final and binding on the CONTRACTOR.<br />

c) If the rates <strong>for</strong> the altered, additional or substituted<br />

WORK cannot be determined in the manner<br />

specified in sub-clause(s) and (b) above, then the<br />

CONTRACTOR shall, within 7 days <strong>of</strong> the date <strong>of</strong><br />

receipt <strong>of</strong> order to carry out the WORK, in<strong>for</strong>m the<br />

ENGINEER-IN-CHARGE <strong>of</strong> the rates which it is<br />

his intention to charge <strong>for</strong> such class <strong>of</strong> WORK,<br />

supported by analysis <strong>of</strong> the rate or rates claimed,<br />

and the ENGINEER-IN-CHARGE shall determine<br />

the rate or rates on the basis <strong>of</strong> the prevailing market<br />

rates, labour cost at schedule <strong>of</strong> labour rates plus<br />

10% to cover contractor's supervision, overheads<br />

and pr<strong>of</strong>it and pay the CONTRACTOR<br />

accordingly. The opinion <strong>of</strong> the ENGINEER-<br />

IN-CHARGE as to current market rates <strong>of</strong> materials<br />

and the quantum <strong>of</strong> labour involved per unit <strong>of</strong><br />

measurement will be final and binding on the<br />

CONTRACTOR.<br />

d) Where the item <strong>of</strong> work will be executed through<br />

nominated specialist agency as approved by the<br />

ENGINEER-IN-CHARGE, then the actual amount<br />

paid to such nominated agency supported by<br />

documentary evidence and as certified by<br />

ENGINEER-IN-CHARGE shall be considered plus<br />

82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!