TENDER NO.: <strong>GAIL</strong>/ND/C&P-MKTG/GT/14/2007<br />

responsiveness is to be based on the contents <strong>of</strong> the bid itself without recourse to the<br />

extrinsic evidence.<br />

16.5.3 A bid determined as substantially non-responsive will be rejected by the<br />

EMPLOYER and may not subsequently be allowed by the EMPLOYER to be made<br />

responsive by the Bidder by correction <strong>of</strong> the non-con<strong>for</strong>mity.<br />

16.5.4 Bids not con<strong>for</strong>ming to technical specification/requirements as mentioned in Bid<br />

Document will be rejected.<br />

16.5.5 Conditional Bids will be liable <strong>for</strong> rejection.<br />

16.5.6 The evaluation <strong>of</strong> the bid shall be done on the lowest cost to <strong>GAIL</strong>.<br />

16.5.7 Bidder’s Bid shall be considered non-responsive and rejected, if deviations are taken to<br />

the under mentioned provisions <strong>of</strong> TENDER by the Bidder:-<br />

I) Bid Security as per as per Article- 6.0 <strong>of</strong> GCC.<br />

ii) Per<strong>for</strong>mance Security (Contract Per<strong>for</strong>mance Bank Guarantee) as per<br />

Article- 24.0 <strong>of</strong> GCC.<br />

iii) Validity <strong>of</strong> bid .<br />

iv) Non-acceptance <strong>of</strong> ARBITRATION, Firm Prices, Force Majeure clauses.<br />

v) Offers with completion schedule longer than the time stipulated as per bid<br />

document.<br />

vi) Price not quoted as per the <strong>for</strong>mat <strong>of</strong> Price schedule.<br />

vii) Payment Terms.<br />

viii) Termination <strong>of</strong> Contract as per Article- 32.0 <strong>of</strong> GCC<br />

ix) Price Reduction Schedule as per Article- 27.0 <strong>of</strong> GCC<br />

17.0 ARTICLE - 17 : OPENING OF PRICE BIDS<br />

The price bids <strong>of</strong> the substantially responsive Bidders will be opened. The price bids<br />

<strong>of</strong> those Bidders determined to be not substantially responsive will be rejected.<br />

18.0 ARTICLE - 18 : COMPARISON OF BIDS<br />

18.1 The EMPLOYER will evaluate and compare bids previously determined to be<br />

substantially responsive.<br />