69. Materials obtained from<br />

dismantling:<br />

economically and solely <strong>for</strong> the purpose <strong>of</strong> the CONTRACT<br />

and not dispose them <strong>of</strong>f without the permission <strong>of</strong> the<br />

EMPLOYER and return, if required by the<br />

ENGINEER-IN-CHARGE, shall determine having due regard<br />

to the condition <strong>of</strong> the materials. The price allowed to the<br />

CONTRACTOR, however, shall not exceed the amount<br />

charged to him excluding the storage charges, if any. The<br />

decision <strong>of</strong> the ENGINEER-IN-CHARGE shall be final and<br />

conclusive in such matters. In the event <strong>of</strong> breach <strong>of</strong> the<br />

a<strong>for</strong>esaid condition, the CONTRACTOR shall, in terms <strong>of</strong> the<br />

licences or permits and/or criminal breach <strong>of</strong> trust, be liable to<br />

compensate the EMPLOYER at double rate or any higher rate,<br />

in the event <strong>of</strong> those materials at that time having higher rate<br />

or not being available in the market, then any other rate to be<br />

determined by the ENGINEER-IN-CHARGE and his decision<br />

shall be final and conclusive.<br />

69.1 If the CONTRACTOR in the course <strong>of</strong> execution <strong>of</strong> the<br />

WORK is called upon to dismantle any part <strong>for</strong> reasons other<br />

than those stipulated in Clauses 74 and 77 hereunder, the<br />

materials obtained in the WORK <strong>of</strong> dismantling etc., will be<br />

considered as the EMPLOYER's property and will be disposed<br />

<strong>of</strong>f to the best advantage <strong>of</strong> the EMPLOYER.<br />

70. Articles <strong>of</strong> value found: 70.1 All gold, silver and other minerals <strong>of</strong> any description and all<br />

precious stones, coins, treasure relics, antiquities and other<br />

similar things which shall be found in, under or upon the SITE,<br />

shall be the property <strong>of</strong> the EMPLOYER and the<br />

CONTRACTOR shall duly preserve the same to the<br />

satisfaction <strong>of</strong> the ENGINEER-IN-CHARGE and shall from<br />

time to time deliver the same to such person or persons<br />

71.<br />

Discrepancies between<br />

instructions:<br />

72. Action where no<br />

specification is issued:<br />

indicated by the EMPLOYER.<br />

71.1 Should any discrepancy occur between the various instructions<br />

furnished to the CONTRACTOR, his agent or staff or any<br />

doubt arises as to the meaning <strong>of</strong> any such instructions or<br />

should there be any misunderstanding between the<br />

CONTRACTOR's staff and the ENGINEER-IN- CHARGE's<br />

staff, the CONTRACTOR shall refer the matter immediately<br />

in writing to the ENGINEER-IN-CHARGE whose decision<br />

thereon shall be final and conclusive and no claim <strong>for</strong> losses<br />

alleged to have been caused by such discrepancies between<br />

instructions, doubts, or misunderstanding shall in any event be<br />

admissible.<br />

72.1 In case <strong>of</strong> any class <strong>of</strong> WORK <strong>for</strong> which there is no<br />

SPECIFICATION supplied by the EMPLOYER as mentioned<br />

in the Tender Documents such WORK shall be carried out in<br />

accordance with Indian Standard Specifications and if the<br />

Indian Standard Specifications do not cover the same, the<br />

WORK should be carried out as per standard Engineering<br />

Practice subject to the approval <strong>of</strong> the<br />

ENGINEER-IN-CHARGE.<br />

90