95. Final decision and final<br />
certificate:<br />
96. Certificate and payments<br />
on evidence <strong>of</strong><br />
completion:<br />
97. Deductions from the<br />
contract price:<br />
`covered' up work.<br />
iv) Certificates <strong>of</strong> final levels as set out <strong>for</strong> various works.<br />
v) Certificates <strong>of</strong> tests per<strong>for</strong>med <strong>for</strong> various WORKS.<br />
vi) Material appropriation, Statement <strong>for</strong> the materials<br />
issued by the EMPLOYER <strong>for</strong> the WORK and list <strong>of</strong><br />
surplus materials returned to the EMPLOYER's store<br />
duly supported by necessary documents.<br />
95.1 Upon expiry <strong>of</strong> the period <strong>of</strong> liability and subject to the<br />
ENGINEER-IN-CHARGE being satisfied that the WORKS<br />
have been duly maintained by the CONTRACTOR during<br />
monsoon or such period as hereinbe<strong>for</strong>e provided in Clause<br />
80 & 81 and that the CONTRACTOR has in all respect duly<br />
made-up any subsidence and per<strong>for</strong>med all his obligations<br />
under the CONTRACT, the ENGINEER-IN- CHARGE shall<br />
(without prejudice to the rights <strong>of</strong> the EMPLOYER to retain<br />
the provisions <strong>of</strong> relevant Clause here<strong>of</strong>) otherwise give a<br />
certificate herein referred to as the FINAL CERTIFICATE to<br />
that effect and the CONTRACTOR shall not be considered to<br />
have fulfilled the whole <strong>of</strong> his obligations under CONTRACT<br />
until FINAL CERTIFICATE shall have been given by the<br />
ENGINEER-IN- CHARGE notwithstanding any previous<br />
entry upon the WORK and taking possession, working or<br />
using <strong>of</strong> the same or any part there<strong>of</strong> by the EMPLOYER.<br />
96.1 Except the FINAL CERTIFICATE, no other certificates or<br />
payments against a certificate or on general account shall be<br />
taken to be an admission by the EMPLOYER <strong>of</strong> the due<br />
per<strong>for</strong>mance <strong>of</strong> the CONTRACT or any part there<strong>of</strong> or <strong>of</strong><br />
occupancy or validity <strong>of</strong> any claim by the CONTRACTOR.<br />
97.1 All costs, damages or expenses which EMPLOYER may<br />
have paid or incurred, which under the provisions <strong>of</strong> the<br />
CONTRACT, the CONTRACTOR is liable/will be liable,<br />
will be claimed by the EMPLOYER. All such claims shall be<br />
billed by the EMPLOYER to the CONTRACTOR regularly<br />
as and when they fall due. Such claims shall be paid by the<br />
CONTRACTOR within 15 (fifteen) days <strong>of</strong> the receipt <strong>of</strong> the<br />
corresponding bills and if not paid by the CONTRACTOR<br />
within the said period, the EMPLOYER may, then, deduct the<br />
amount from any moneys due i.e., Contract Per<strong>for</strong>mance<br />
Security or becoming due to the CONTRACTOR under the<br />
CONTRACT or may be recovered by actions <strong>of</strong> law or<br />
otherwise, if the CONTRACTOR fails to satisfy the<br />
EMPLOYER <strong>of</strong> such claims.<br />
106