04.08.2013 Views

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

Hiring of VPN Services for GAIL Agartala

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

82. Guarantee/transfer <strong>of</strong><br />

guarantee:<br />

83. Training <strong>of</strong> employer's<br />

personnel:<br />

84. Replacement <strong>of</strong> defective<br />

parts and materials:<br />

taken over, the period allowed <strong>for</strong> carrying out such WORK<br />

will be normally one month. If any defect be not remedied<br />

within a reasonable time, the EMPLOYER may proceed to do<br />

the WORK at CONTRACTOR's risk and expense and deduct<br />

from the final bill such amount as may be decided by the<br />

EMPLOYER.<br />

If by reason <strong>of</strong> any default on the part <strong>of</strong> the CONTRACTOR<br />

a COMPLETION CERTIFICATE has not been issued in<br />

respect <strong>of</strong> any portion <strong>of</strong> the WORK within one month after<br />

the date fixed by the CONTRACT <strong>for</strong> the completion <strong>of</strong> the<br />

WORK, the EMPLOYER shall be at liberty to use the WORK<br />

or any portion there<strong>of</strong> in respect <strong>of</strong> which a completion<br />

certificate has not been issued, provided that the WORK or the<br />

portion there<strong>of</strong> so used as a<strong>for</strong>esaid shall be af<strong>for</strong>ded<br />

reasonable opportunity <strong>for</strong> completing these works <strong>for</strong> the<br />

issue <strong>of</strong> Completion Certificate.<br />

82.1 For works like water-pro<strong>of</strong>ing, acid and alkali resisting<br />

materials, pre-construction soil treatment against termite or<br />

any other specialized works etc. the CONTRACTOR shall<br />

invariably engage SUB-CONTRACTORS who are specialists<br />

in the field and firms <strong>of</strong> repute and such a<br />

SUB-CONTRACTOR shall furnish guarantees <strong>for</strong> their<br />

workmanship to the EMPLOYER, through the<br />

CONTRACTOR. In case such a SUB-CONTRACTOR/ firm<br />

is not prepared to furnish a guarantee to the EMPLOYER, the<br />

CONTRACTOR shall give that guarantee to the EMPLOYER<br />

directly.<br />

83.1 The CONTRACTOR undertakes to provide training to<br />

Engineering personnel selected and sent by the EMPLOYER<br />

at the works <strong>of</strong> the CONTRACTOR without any cost to the<br />

EMPLOYER. The period and the nature <strong>of</strong> training <strong>for</strong> the<br />

individual personnel shall be agreed upon mutually between<br />

the CONTRACTOR and the EMPLOYER. These<br />

engineering personnel shall be given special training at the<br />

shops, where the equipment will be manufactured and/ or in<br />

their collaborator's works and where possible, in any other<br />

plant where equipment manufactured by the CONTRACTOR<br />

or his collaborators is under installation or test to enable those<br />

personnel to become familiar with the equipment being<br />

furnished by the CONTRACTOR. EMPLOYER shall bear<br />

only the to and fro fare <strong>of</strong> the said engineering personnel.<br />

84.1 If during the progress <strong>of</strong> the WORK, EMPLOYER shall<br />

decide and in<strong>for</strong>m in writing to the CONTRACTOR, that the<br />

CONTRACTOR has manufactured any plant or part <strong>of</strong> the<br />

plant unsound or imperfect or has furnished plant inferior to<br />

the quality specified, the CONTRACTOR on receiving details<br />

<strong>of</strong> such defects or deficiencies shall at his own expenses within<br />

7 (seven) days <strong>of</strong> his receiving the notice, or otherwise within<br />

96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!