Traffic Assessment - Renfrewshire Council
Traffic Assessment - Renfrewshire Council
Traffic Assessment - Renfrewshire Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
I I I ( 10.0)I ( 10.0)I ( 0.0)I ( 10.0)I<br />
I I I I I I I<br />
I I ARM D I 0.218 I 0.055 I 0.727 I 0.000 I<br />
I I I 36.0 I 9.0 I 120.0 I 0.0 I<br />
I I I ( 10.0)I ( 10.0)I ( 10.0)I ( 0.0)I<br />
I I I I I I I<br />
--------------------------------------------------------------------<br />
TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA<br />
DEFAULT PROPORTIONS OF HEAVY VEHICLES ARE USED<br />
. QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT<br />
--------------------------------------------------------<br />
FOR DEMAND SET 2012 PM Base + Development<br />
AND FOR TIME PERIOD 1<br />
.-------------------------------------------------------------------------------------------------------------<br />
-----<br />
I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE<br />
DELAY I<br />
I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER<br />
ARRIVING I<br />
I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE<br />
(MIN) I<br />
I 16.00-16.15<br />
I<br />
I B-ACD 0.34 6.65 0.051 0.00 0.05 0.8 0.16<br />
I<br />
I A-B 0.35<br />
I<br />
I A-C 4.91<br />
I<br />
I A-D 2.58<br />
I<br />
I AB-C ( 4.94)<br />
I<br />
I AB-D ( 2.67) 7.87 0.340 0.00 0.50 7.1 0.19<br />
I<br />
I D-AB 0.56 7.85 0.072 0.00 0.08 1.1 0.14<br />
I