14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1 Introduction<br />

Development History<br />

1.1 Outline planning permission, planning permission in principle (PPP) was granted in 2009 for the<br />

Masterplan of a community growth area (Dargavel Village) on the site of the former Royal<br />

Ordnance works to the west of Bishopton, <strong>Renfrewshire</strong> (Ref: 06/0602/PP). The Masterplan for the<br />

village comprises a mixed use development consisting of residential, employment, retail, a number<br />

of community facilities and an expansion to the park and ride at the Bishopton Railway Station. A<br />

copy of the consented Masterplan layout is provided in Appendix A and the location is indicated by<br />

Figure 1.1 below.<br />

Figure 1.1 Site Location<br />

1.2 JMP Consultants Ltd (JMP) were responsible for preparing a number of studies in support of the<br />

Masterplan, including a Transport <strong>Assessment</strong> that identified a series of transport interventions that<br />

will seek to provide a sustainable development, helping to integrate it with the existing Bishopton<br />

Village and the surrounding local and strategic network.<br />

Job No Report No Issue no Report Name Page<br />

SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!