14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Basic Results Summary<br />

Lane Input Data<br />

Junction: Kingston Rd_Greenock Road<br />

Lane<br />

1/1<br />

(Greenock<br />

Road West)<br />

2/1<br />

(Kingston<br />

Road)<br />

3/1<br />

(Greenock<br />

Road East)<br />

4/1<br />

(Greenock<br />

Road West<br />

Exit)<br />

5/1<br />

(Kingston<br />

Road Exit)<br />

6/1<br />

(Greenock<br />

Road East<br />

Exit)<br />

Lane<br />

Type<br />

Phase Input Data<br />

Phases Start<br />

Disp.<br />

End<br />

Disp.<br />

Physical<br />

Length<br />

(PCU)<br />

Sat<br />

Flow<br />

Type<br />

Def User<br />

Saturation<br />

Flow<br />

(PCU/Hr)<br />

Lane<br />

Width<br />

(m)<br />

Gradient Nearside<br />

Lane<br />

U A 2 3 60.0 Geom - 3.50 0.00 Y<br />

U C 2 3 60.0 Geom - 3.50 0.00 Y<br />

O B 2 3 60.0 Geom - 3.50 0.00 Y<br />

Turns<br />

Arm 5<br />

Left<br />

Arm 6<br />

Ahead<br />

Arm 4<br />

Right<br />

Arm 6<br />

Left<br />

Arm 4<br />

Ahead<br />

Arm 5<br />

Right<br />

U 2 3 60.0 Inf - - - - - -<br />

U 2 3 60.0 Inf - - - - - -<br />

U 2 3 60.0 Inf - - - - - -<br />

Phase Name Phase Type Assoc. Phase Street Min Cont Min<br />

A <strong>Traffic</strong> 7 7<br />

B <strong>Traffic</strong> 7 7<br />

C <strong>Traffic</strong> 7 7<br />

D Pedestrian 6 6<br />

E Pedestrian 6 6<br />

F Pedestrian 6 6<br />

Turning<br />

Radius<br />

(m)<br />

10.00<br />

Inf<br />

10.00<br />

10.00<br />

Inf<br />

Inf

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!