Traffic Assessment - Renfrewshire Council
Traffic Assessment - Renfrewshire Council
Traffic Assessment - Renfrewshire Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2 Existing and Committed Transport Infrastructure<br />
2.1 The proposed development content and land use mix for the consented Dargavel Village<br />
Masterplan was developed by a working group which included representatives of <strong>Renfrewshire</strong><br />
<strong>Council</strong> and the then Scottish Government. The consented masterplan was refined to provide the<br />
following key elements that forms the nucleus of the consented PPP<br />
• 2,500 residential units;<br />
• 138,000m 2 GFA of employment;<br />
• 12,000m 2 total GFA of community and local service facilities (library, health centre, shops,<br />
village hall, public parks);<br />
• A Primary School<br />
2.2 Table 2.1 below indicates the current construction phasing programme for the consented<br />
Masterplan.<br />
Table 2.1 Dargavel Masterplan Construction Phasing<br />
Phases of<br />
development<br />
Output<br />
Housing (units) Employment (ha) Community<br />
Phase Cumulative Phase Cumulative<br />
2012-2016 745 745 19.13 19.13 Health Centre, Village<br />
2017-2018<br />
2019-2022<br />
388<br />
617<br />
1133<br />
1750<br />
2.86<br />
10.10<br />
21.99<br />
32.09<br />
Square, Library, Village<br />
Hall, Recreation<br />
Ground, Primary<br />
School.<br />
2023-2025 444 2194 13.94 46.03 ---<br />
2026-2027 306 2500 0.00 46.03 ---<br />
2,500<br />
Cass Associates Phasing Matrix<br />
46.03 ---<br />
2.3 The transport infrastructure for the consented Dargavel Village and the requirements for the<br />
Masterplan have previously been reviewed in considerable detail by the following reports<br />
undertaken by JMP:<br />
• Transport <strong>Assessment</strong> (2008);<br />
• STAG <strong>Assessment</strong>s Parts 1 and 2 (Part 2 approved 2008);<br />
• Public Transport Study (2011); and<br />
• Park & Ride Demand Study (2011).<br />
2.4 This section of the report details the existing infrastructure and proposed transport interventions<br />
that will be taken forward for the overall Masterplan and provided at key stages of development.<br />
The above reports can be accessed and viewed from <strong>Renfrewshire</strong> <strong>Council</strong>’s website.<br />
Page Job No Report No Issue no Report Name<br />
4 SCT3526 1 1 Dargavel Village<br />
Proposed Village Core Development