14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 Existing and Committed Transport Infrastructure<br />

2.1 The proposed development content and land use mix for the consented Dargavel Village<br />

Masterplan was developed by a working group which included representatives of <strong>Renfrewshire</strong><br />

<strong>Council</strong> and the then Scottish Government. The consented masterplan was refined to provide the<br />

following key elements that forms the nucleus of the consented PPP<br />

• 2,500 residential units;<br />

• 138,000m 2 GFA of employment;<br />

• 12,000m 2 total GFA of community and local service facilities (library, health centre, shops,<br />

village hall, public parks);<br />

• A Primary School<br />

2.2 Table 2.1 below indicates the current construction phasing programme for the consented<br />

Masterplan.<br />

Table 2.1 Dargavel Masterplan Construction Phasing<br />

Phases of<br />

development<br />

Output<br />

Housing (units) Employment (ha) Community<br />

Phase Cumulative Phase Cumulative<br />

2012-2016 745 745 19.13 19.13 Health Centre, Village<br />

2017-2018<br />

2019-2022<br />

388<br />

617<br />

1133<br />

1750<br />

2.86<br />

10.10<br />

21.99<br />

32.09<br />

Square, Library, Village<br />

Hall, Recreation<br />

Ground, Primary<br />

School.<br />

2023-2025 444 2194 13.94 46.03 ---<br />

2026-2027 306 2500 0.00 46.03 ---<br />

2,500<br />

Cass Associates Phasing Matrix<br />

46.03 ---<br />

2.3 The transport infrastructure for the consented Dargavel Village and the requirements for the<br />

Masterplan have previously been reviewed in considerable detail by the following reports<br />

undertaken by JMP:<br />

• Transport <strong>Assessment</strong> (2008);<br />

• STAG <strong>Assessment</strong>s Parts 1 and 2 (Part 2 approved 2008);<br />

• Public Transport Study (2011); and<br />

• Park & Ride Demand Study (2011).<br />

2.4 This section of the report details the existing infrastructure and proposed transport interventions<br />

that will be taken forward for the overall Masterplan and provided at key stages of development.<br />

The above reports can be accessed and viewed from <strong>Renfrewshire</strong> <strong>Council</strong>’s website.<br />

Page Job No Report No Issue no Report Name<br />

4 SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!