14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 <strong>Traffic</strong> Impact Analysis<br />

General<br />

4.1 As agreed with <strong>Renfrewshire</strong> <strong>Council</strong>, only the net-increase in traffic generated by the 6,000m 2<br />

foodstore has been considered when assessing the impact to the existing local road network. As<br />

the enhanced foodstore will predominantly serve the residents of Dargavel and Bishopton Village,<br />

the following junctions are considered as being within the area of influence:<br />

1. Greenock Road / Station Road priority controlled junction;<br />

2. Greenock Road / Kingston Road priority controlled junction;<br />

3. Greenock Road / Ferry Road / Rossland Crescent signal controlled junction; and<br />

4. Greenock Road / Old Greenock Road / Newton Road junction.<br />

Analysis Period<br />

4.2 It has been agreed with <strong>Renfrewshire</strong> <strong>Council</strong> that the critical assessment period for the<br />

development proposal is the weekday PM peak period.<br />

<strong>Assessment</strong> Year<br />

4.3 It is currently envisaged the foodstore will be complete and operational by 2020. In terms of the<br />

supporting roads infrastructure, it is understood these will be in place and include:<br />

• Upgrading Greenock Road / Kingston Road to traffic signal control;<br />

• The northern and southern roundabouts shall be constructed and linked via the Dargavel<br />

development; and<br />

• The upgrade of Station Road underpass to traffic signal control.<br />

4.4 Given the supporting road infrastructure has been proposed to accommodate the total volume of<br />

traffic that will be generated by the consented Masterplan, it is consider appropriate to assess the<br />

impact of the 6,000m 2 foodstore with full development. This therefore equates to a design year<br />

assessment of 2027.<br />

<strong>Traffic</strong> Growth<br />

4.5 The principle of using recent traffic surveys to identify traffic growth was discussed and agreed with<br />

<strong>Renfrewshire</strong> <strong>Council</strong> at a meeting on 31 October 2012. It was also agreed that should the surveys<br />

demonstrate a reduction in traffic volumes on the A8, data from the 2008 Transport <strong>Assessment</strong><br />

should be used to provide a robust analysis.<br />

4.6 Numerous traffic surveys have been undertaken at several locations throughout Bishopton to<br />

support the various studies for the Masterplan. In terms of the analysis for the 2008 Transport<br />

<strong>Assessment</strong>, which was used to inform the access strategy and supporting local road infrastructure<br />

improvements, this was a combination of 2005 and 2002 traffic data. The 2005 data was used to<br />

establish a level of background growth from 2002, and therefore confirm its suitability for the 2008<br />

analysis.<br />

Job No Report No Issue no Report Name Page<br />

SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!