- Page 1 and 2:
Dargavel Village Proposed Village C
- Page 3 and 4:
Dargavel Village Proposed Village C
- Page 5 and 6:
Travel Plan........................
- Page 7 and 8:
1.3 The vehicular access strategy f
- Page 9 and 10:
2 Existing and Committed Transport
- Page 11 and 12:
Public Transport 2.12 Conditions 13
- Page 13 and 14:
Table 2.3 Dargavel Masterplan - Bus
- Page 15 and 16:
Greenock Road / Kingston Road 2.34
- Page 17 and 18:
3.7 Furthermore, with the increase
- Page 19 and 20:
Table 3.4 Internal & External Peopl
- Page 21 and 22:
3.31 Following the preparation of a
- Page 23 and 24:
4.7 As the consented infrastructure
- Page 25 and 26:
4.17 With regard to the signalised
- Page 27 and 28:
Table 4.5 A8 Greenock Road / Statio
- Page 29 and 30:
4.42 For the purposes of this exerc
- Page 31 and 32:
• Junction format and is there a
- Page 33 and 34:
Figure 5.1 Station Road Underpass F
- Page 35 and 36:
Table 5.1 Dargavel Masterplan - Bus
- Page 37 and 38:
6 Car Parking Strategy Management 6
- Page 39 and 40:
Table 6.2 Town Centre Shared Trips
- Page 41 and 42:
7 Conclusions 7.1 JMP Consultants L
- Page 43 and 44:
Rossland Crescent Access • A furt
- Page 45:
Consented Masterplan Page Job No Re
- Page 49 and 50:
Indicative Village Centre Layout Pa
- Page 52 and 53:
Appendix C Walking and Cycling Info
- Page 54 and 55:
© Crown copyright. All rights rese
- Page 56:
Key NCN 75 NCN 7 Existing National
- Page 59:
Park and Ride Indicative JMP 2011 P
- Page 63:
Proposed Bus Network Proposals JMP
- Page 67 and 68:
Traffic Data Figure F1 - Weekday PM
- Page 69 and 70:
Old Greenock Road Ferry Road Kingst
- Page 71 and 72:
In 94 Out 98 Old Greenock Road Ferr
- Page 73 and 74:
Old Greenock Road Ferry Road Kingst
- Page 75 and 76:
Output Area Population Distribution
- Page 77 and 78:
Old Greenock Road Ferry Road Kinsto
- Page 79 and 80:
Weekday Arrivals Departures Totals
- Page 81 and 82:
2008 Transport Assessment Chapter 4
- Page 83 and 84:
4.10 It has been assumed that all p
- Page 85 and 86:
4.26 It should be noted that althou
- Page 87 and 88:
Employment 4.38 As with the residen
- Page 89 and 90:
Secondary Education 4.52 The second
- Page 91 and 92:
Table 4.13 Peak Hour Residential an
- Page 93 and 94:
Table 4.16 Proposed Residential Dev
- Page 95 and 96:
Methodology for Employment Developm
- Page 97 and 98:
Table 4.24 Employment Development -
- Page 99 and 100:
Conclusion 4.80 The residual car tr
- Page 102 and 103:
Appendix H Proposed Road Infrastruc
- Page 104:
Rev. Client Project Title Date Draw
- Page 108 and 109: TRICS and Trip Generation Calculati
- Page 110 and 111: TRICS 2012(b)v6.10.2 171012 B15.27
- Page 112 and 113: TRICS 2012(b)v6.10.2 171012 B15.27
- Page 114 and 115: TRICS 2012(b)v6.10.2 171012 B15.27
- Page 116 and 117: Bishopton Retail Trip Generation Ca
- Page 118 and 119: Bishopton Retail Transport Assessme
- Page 120 and 121: Junction Analysis Output Files 1 -
- Page 122 and 123: ENUMERATOR : JOB NUMBER : SCT3526 S
- Page 124 and 125: -----------------------------------
- Page 126 and 127: TIME PERIOD BEGINS 16.00 AND ENDS 1
- Page 128 and 129: I D-C 1.51 5.79 0.260 0.00 0.34 4.9
- Page 130 and 131: I A-D 3.78 I I AB-C ( 7.23) I I AB-
- Page 132 and 133: I 17.00-17.15 I I B-ACD 0.40 6.18 0
- Page 134 and 135: ------------------------- TIME NO.
- Page 136 and 137: I C-A I 503.8 I 335.8 I I I I I I C
- Page 138 and 139: -----------------------------------
- Page 140 and 141: . QUEUE AND DELAY INFORMATION FOR E
- Page 142 and 143: I C-A 5.36 I I C-B 0.12 I I CD-A (
- Page 144 and 145: I AB-D ( 3.89) 7.31 0.532 1.09 1.11
- Page 146 and 147: I A-B 0.30 I I A-C 4.79 I I A-D 2.5
- Page 148 and 149: . QUEUE FOR STREAM CD-B -----------
- Page 150 and 151: TRL LIMITED (C) COPYRIGHT 2006 CAPA
- Page 152 and 153: I MAJOR ROAD RIGHT TURN - WIDTH I (
- Page 154 and 155: I ARM C I 15.00 I 45.00 I 75.00 I 6
- Page 158 and 159: I B-C 4.84 6.15 0.787 24.60 8.50 24
- Page 160 and 161: . 16.30 1.8 ** 16.45 4.5 **** 17.00
- Page 162 and 163: TIME PERIOD BEGINS 16.00 AND ENDS 1
- Page 164 and 165: I TIME DEMAND CAPACITY DEMAND/ PEDE
- Page 166 and 167: I I .------------------------------
- Page 168 and 169: ENDING IN QUEUE 16.15 0.6 * 16.30 0
- Page 170 and 171: Output Summary Output Summary User
- Page 172 and 173: Output Summary Scenario 2: 'Scenari
- Page 174 and 175: Output Summary Scenario 3: 'Scenari
- Page 176 and 177: Output Summary Lane Input Data Junc
- Page 178 and 179: Output Summary Stage Diagram 1 Min
- Page 180 and 181: Basic Results Summary Basic Results
- Page 182 and 183: Basic Results Summary Scenario 2: '
- Page 184 and 185: Basic Results Summary Scenario 3: '
- Page 186 and 187: Basic Results Summary Lane Input Da
- Page 188 and 189: Basic Results Summary Stage Sequenc
- Page 190 and 191: Basic Results Summary Basic Results
- Page 192 and 193: Basic Results Summary Lane Input Da
- Page 194 and 195: ___________________ A R C A D Y 6 _
- Page 196 and 197: E = entry width Vm = minimum approa
- Page 198 and 199: I 16.00-16.15 I I ARM A 7.10 15.65
- Page 200 and 201: -----------------------------------
- Page 202 and 203: .QUEUE AT ARM C -------------- TIME
- Page 205 and 206: Appendix K Renfrewshire Council Con
- Page 207 and 208:
Meeting Minutes Date 1 November 201
- Page 209 and 210:
Meeting at Renfrewshire Council Job
- Page 211 and 212:
This e-mail, and any files transmit
- Page 213:
[D] 0141 226 6926 [T] 0141 221 4030