4.22 The updated Linsig analysis for the base situation indicates the junction will operate within capacity<br />

during the weekday PM peak period. The results for the base plus development traffic<br />

demonstrates the junction will continue to operate within capacity with the proposed 6,000m 2<br />

foodstore and there will be a negligible increase in terms of queues.<br />

A8 Greenock Road / Kingston Road<br />

4.23 The 2008 Transport <strong>Assessment</strong> identified this junction required to be upgraded from a priority<br />

controlled junction to traffic signal control, in order to mitigate the weekday AM peak from the<br />

consented Dargavel Masterplan. It is understood the newly installed traffic lights at this junction will<br />

be operational sometime early 2013.<br />

4.24 Using phase and intergreen times from the controller specification form (TR2500), we have<br />

undertaken an updated base analysis and a base plus development analysis using Linsig Version<br />

3. The results of each assessment for the weekday PM peak period are provided in Table 4.4<br />

below.<br />

Table 4.4 A8 Greenock Road / Kingston Road<br />

Link<br />

Number<br />

Base Base plus Dev<br />

Lane Description DoS (%) Max Q DoS (%) Max Q<br />

1/1 Greenock Road (West) Left Ahead Right 41.3% 6 46.1% 8<br />

2/1 Kingston Road Right Left 63.9% 5 76.9% 7<br />

3/1 Greenock Road (East) Ahead Right Left 63.1% 12 80.0% 17<br />

DoS% = Degree of Saturation where 90% is considered to be the practical capacity<br />

4.25 The results in Table 4.4 demonstrate the newly installed traffic signals will operate well within<br />

capacity following the increase on traffic volumes associated with the 6,000m 2 foodstore proposal<br />

for the Dargavel Village Centre.<br />

A8 Greenock Road / Station Road<br />

4.26 While there is potential for vehicle trips to access the village core and the foodstore via the northern<br />

access road from the A8 (access strategy for the consented Masterplan), <strong>Renfrewshire</strong> <strong>Council</strong> has<br />

requested the Transport <strong>Assessment</strong> considers 100% of the additional retail vehicle trips accesses<br />

the village core via the A8 Greenock Road / Station Road junction. This is principally a 3-arm<br />

priority controlled junction, although it is noted a commercial property takes access from Greenock<br />

Road opposite Station Road. As noted in Chapter 2, <strong>Renfrewshire</strong> <strong>Council</strong> have advise visibility<br />

from Station Road onto Greenock Road is substandard.<br />

4.27 Assuming 100% of additional trips use the Station Road junction, the results of the PICADY<br />

analysis are provided in Table 4.5 below.<br />

Job No Report No Issue no Report Name Page<br />

SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development<br />

21