14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Greenock Road / Kingston Road<br />

2.34 The 2008 Transport <strong>Assessment</strong> confirmed that junctions 1, 3 and 4 above would operate with no<br />

significant problems during the weekday AM and PM peak periods. It also confirmed that Greenock<br />

Road / Kingston Road would experience considerable queues during the AM peak and require to<br />

be upgraded to traffic signal control. It is understood the traffic signals will be installed and<br />

operational from early 2013.<br />

Station Road – Railway Bridge Underpass<br />

2.35 While the 2008 analysis indicated that Greenock Road / Station Road junction will operate within<br />

capacity during the weekday AM and PM peak periods, it was subsequently agreed through the<br />

Section 75 Agreement that the road under the railway bridge to the west of the railway line would<br />

be brought under traffic signal control.<br />

2.36 The traffic signals are to firstly, accommodate the additional traffic movements for the park and ride<br />

and the community facilities and secondly, to provide a controlled pedestrian stage through the<br />

underpass.<br />

Page Job No Report No Issue no Report Name<br />

10 SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!