5 Sustainable Transport Infrastructure to Support the<br />

Village Centre<br />

5.1 A number of transport interventions have been identified to support the consented Masterplan and<br />

it will be fundamental for the proposed Village Centre to ensure it not only helps to realise these<br />

proposals, but acts as a catalyst for ensuring Dargavel integrates with the existing Bishopton<br />

Village.<br />

5.2 The following section details the supporting measures that will be available to support access to the<br />

proposed village centre by sustainable modes of transport.<br />

Walking and Cycling<br />

Dargavel Village Centre<br />

5.3 In accordance with available best practice including Designing Streets, the village centre will seek<br />

to reduce the dominance of vehicular traffic where possible. Pedestrians and cyclists will be<br />

catered for by providing a comprehensive network of footways, cycle paths and shared roads. The<br />

aim will be to provide an attractive and safe walking / cycling environment between the various<br />

elements of the village centre with strong links to Dargavel and Bishopton.<br />

5.4 Street lighting and security cameras will be provided throughout the village centre with the<br />

fundamental goal being to improve the safety of pedestrians and cyclists. Cycle parking will be<br />

provided throughout the village centre and where possible, covered and sheltered. The final<br />

number of cycle parking spaces and type will require to be agreed with <strong>Renfrewshire</strong> <strong>Council</strong>.<br />

5.5 Rossland Crescent will provide a key walking and cycling route between the village centre,<br />

Dargavel and Bishopton Village. It should be designed to ensure pedestrians and cyclists have a<br />

sense of priority and this can be achieved through traffic calming, landscaping, street furniture<br />

segregated lanes and high quality materials.<br />

5.6 In terms of links to Dargavel itself, these will be finalised at a later date when the planning<br />

applications for each element are submitted. However, strong pedestrian and cycle links will be<br />

essential to ensure a sustainable development is provided and in accordance with Designing<br />

Streets.<br />

Links to Bishopton Village<br />

5.7 In addition to Rossland Crescent, the main pedestrian and cycle link to / from Bishopton will be the<br />

underpass at the Station Road railway bridge. Proposals to upgrade this to traffic signal control will<br />

also incorporate a dedicated pedestrian stage through the underpass. This proposal will also<br />

provide a new footway connection along the south east boundary of Station Road (to the east of<br />

the railway line). Figure 5.1 below demonstrates the existing underpass, while Figure 5.2 provides<br />

an indication of how this new facility may look based on a similar system previously proposed by<br />

JMP. JMP drawing SCT3526/I/UP/001 in Appendix H demonstrates the indicative layout.<br />

Job No Report No Issue no Report Name Page<br />

SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development<br />

27