14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 4.1 List of 'Committed' Developments<br />

Development Name Location Details<br />

Braehead Braehead Complete<br />

Rolls Royce Inchinnan New manufacturing facility employing 900 people,<br />

opened October 2004. Complete<br />

Candren M8 Junction 29 Consent not granted<br />

Phoenix Finishing Mill Linwood 60 apartments, 2,000m 2 business space, parking<br />

facilities plus 75,000 sq ft superstore and 470 space<br />

car park, opened September 2005. Start delayed<br />

Barbush Mills Houston 88 flats. Complete<br />

Glasgow Airport Expansion of Airport. Ongoing<br />

Cart Corridor Paisley Proposal to redevelop a stretch of the River Cart<br />

Arkleston<br />

extending from Paisley Town Centre towards<br />

Glasgow Airport. Phased mixed use regeneration of<br />

the area over a ten year period. Ongoing<br />

North Renfrew<br />

Development<br />

Status unknown<br />

Spanley Braehead Hotel and Housing – Hotel replaced with KFC – At<br />

pre-application stage<br />

Hillington Frontage On hold<br />

Renfrew Town Centre Renfrew Ongoing<br />

Retail Park Abbotsinch 15,350m 2 Retail Park. Consent lapsed.<br />

4.13 While not all of the above developments are likely to have a direct impact on the local roads in<br />

Bishopton, they have been considered by this Transport <strong>Assessment</strong> as being committed<br />

developments. Therefore, where traffic data from committed development was included on the<br />

local road network by the 2008 analysis, it has been retained by this Transport <strong>Assessment</strong>,<br />

thereby providing a more robust traffic impact analysis.<br />

Analysis Scenarios<br />

4.14 This Transport <strong>Assessment</strong> has considered the following traffic flow scenarios for the detailed<br />

junction assessments<br />

• 2027 Weekday PM Base + Committed Development + Consented Dargavel Masterplan<br />

(referred to as the ‘Base’ assessment); and<br />

• 2027 Weekday PM Base + 6,000m 2 foodstore.<br />

4.15 The detailed analysis of the junctions identified has been undertaken using ARCADY 6, PICADY 5<br />

and Linsig 3 which are industry standard tools for the assessment of roundabouts, priority junctions<br />

and signalised junctions respectively.<br />

4.16 In terms of roundabouts and priority controlled junctions, the maximum practical capacity is taken<br />

as 0.85 (ratio of flow to capacity). The maximum practical capacity, or degree of saturation (DoS)<br />

for traffic signals is 90%.<br />

Job No Report No Issue no Report Name Page<br />

SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!