14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Output Summary<br />

<strong>Traffic</strong> Flows, Actual<br />

Scenario 1: 'Scenario 1' (FG3: '2012 PM Base', Plan 1: 'Network Control Plan 1')<br />

Actual Flow :<br />

Origin<br />

Destination<br />

A B C D Tot.<br />

A 0 45 354 8 407<br />

B 269 0 190 40 499<br />

C 283 190 0 30 503<br />

D 13 10 7 0 30<br />

Tot. 565 245 551 78 1439<br />

Scenario 2: 'Scenario 2' (FG1: '2012 PM Base plus Dev - Option 1', Plan 1: 'Network Control Plan 1')<br />

Actual Flow :<br />

Origin<br />

Destination<br />

A B C D Tot.<br />

A 0 45 367 8 420<br />

B 269 0 215 40 524<br />

C 297 216 0 32 545<br />

D 13 10 9 0 32<br />

Tot. 579 271 591 80 1521<br />

Scenario 3: 'Scenario 3' (FG2: '2012 PM Base plus Dev - Sen', Plan 1: 'Network Control Plan 1')<br />

Actual Flow :<br />

Origin<br />

Destination<br />

A B C D Tot.<br />

A 0 45 354 21 420<br />

B 269 0 190 65 524<br />

C 283 190 0 30 503<br />

D 27 36 7 0 70<br />

Tot. 579 271 551 116 1517

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!