1.9 JMP has been commissioned by BAE Systems to prepare the Transport <strong>Assessment</strong> in support of<br />

the PPP application for the village centre proposals. While the village centre will be developed in<br />

line with the sustainable transport principles adopted by the 2008 Transport <strong>Assessment</strong> (and other<br />

supporting studies), as all other development content and transport interventions will remain the<br />

same, only the traffic implications and the impact of the increase retail floor area will be assessed<br />

in terms of the local road network.<br />

Village Centre Access Strategy<br />

1.10 While the primary access to the village centre from for the existing residents of Bishopton Village<br />

will be via Station Road and this report will demonstrate that with local improvements, it can<br />

accommodate the traffic associated with the village centre and the enhanced foodstore, the<br />

proposed land uses are intended to be for the benefit of the existing residents of Bishopton Village.<br />

The Design Team are keen to maximise the integration of the village centre with the existing village<br />

and are exploring the option of providing an access by car via Rossland Crescent to complement<br />

the proposed walk and cycle links without, however, the opportunity to link to the remainder of<br />

Dargavel.<br />

1.11 Notwithstanding the previous Masterplan and any associated conditions, the sensitivity of the local<br />

road network and the potential benefits to the existing residents of Bishopton Village has been<br />

considered by examining travel times to the proposed village centre. This report also provides<br />

some recommendations for the layout and form of the link from Rossland Crescent and these<br />

would be developed at later stage, subject to further consultation with <strong>Renfrewshire</strong> <strong>Council</strong>.<br />

Report Structure<br />

1.12 Following on from this introductory chapter, the structure of the report is as follows:<br />

• Chapter 2 – Existing and Committed Transport Infrastructure<br />

• Chapter 3 – Dargavel Village Centre Development Travel Characteristics<br />

• Chapter 4 – <strong>Traffic</strong> Impact Analysis<br />

• Chapter 5 – Sustainable Transport Infrastructure to Support the Village Centre<br />

• Chapter 6 – Car Parking Strategy<br />

• Chapter 7 – Conclusions<br />

1.13 The Transport <strong>Assessment</strong> should be read in conjunction with the supporting JMP Appendices<br />

Report.<br />

1.14 This Transport <strong>Assessment</strong> has been undertaken in consultation with <strong>Renfrewshire</strong> <strong>Council</strong>’s<br />

Roads Department. JMP would like to take this opportunity to thank the Roads Department for their<br />

assistance in the preparation of this report.<br />

Job No Report No Issue no Report Name Page<br />

SCT3526 1 1 Dargavel Village<br />

Proposed Village Core Development<br />

3