14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Output Summary<br />

Network Results<br />

Item<br />

Network:<br />

Proposed<br />

Village Centre<br />

Development<br />

Greenock<br />

Road_Ferry<br />

Road<br />

1/1<br />

2/1<br />

3/1<br />

4/1<br />

Lane<br />

Description<br />

Lane<br />

Type<br />

Full<br />

Phase<br />

Arrow<br />

Phase<br />

Num<br />

Greens<br />

Total<br />

Green<br />

(s)<br />

Arrow<br />

Green<br />

(s)<br />

Demand<br />

Flow<br />

(pcu)<br />

Sat Flow<br />

(pcu/Hr)<br />

Capacity<br />

(pcu)<br />

Deg<br />

Sat<br />

(%)<br />

Turners<br />

In Gaps<br />

(pcu)<br />

Turners<br />

When<br />

Unopposed<br />

(pcu)<br />

Turners In<br />

Intergreen<br />

(pcu)<br />

Total<br />

Delay<br />

(pcuHr)<br />

Av.<br />

Delay<br />

Per PCU<br />

(s/pcu)<br />

- - - - - - - - - 82.8% 500 0 2 18.6 - -<br />

- - - - - - - - - 82.8% 500 0 2 18.6 - -<br />

Greenock<br />

Road West<br />

Left Ahead<br />

Right<br />

Ferry Road<br />

North Right<br />

Left Ahead<br />

Greenock<br />

Road East<br />

Ahead Right<br />

Left<br />

Rossland<br />

Crescent Left<br />

Ahead Right<br />

O A 1 50 - 420 1968 836 50.2% 8 0 0 3.4 29.5 10.7<br />

O B 1 43 - 524 1726 633 82.8% 269 0 0 7.3 50.5 18.2<br />

O C 1 50 - 545 1948 665 81.9% 214 0 2 7.5 49.7 18.7<br />

O D 1 43 - 32 1827 670 4.8% 9 0 0 0.2 27.4 0.7<br />

C1 PRC for Signalled Lanes (%): 8.7 Total Delay for Signalled Lanes (pcuHr): 18.56 Cycle Time (s): 120<br />

PRC Over All Lanes (%): 8.7 Total Delay Over All Lanes(pcuHr): 18.56<br />

Mean<br />

Max<br />

Queue<br />

(pcu)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!