14.08.2013 Views

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

Traffic Assessment - Renfrewshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Output Summary<br />

Network Results<br />

Item<br />

Network:<br />

Proposed<br />

Village Centre<br />

Development<br />

Greenock<br />

Road_Ferry<br />

Road<br />

1/1<br />

2/1<br />

3/1<br />

4/1<br />

Lane<br />

Description<br />

Lane<br />

Type<br />

Full<br />

Phase<br />

Arrow<br />

Phase<br />

Num<br />

Greens<br />

Total<br />

Green<br />

(s)<br />

Arrow<br />

Green<br />

(s)<br />

Demand<br />

Flow<br />

(pcu)<br />

Sat Flow<br />

(pcu/Hr)<br />

Capacity<br />

(pcu)<br />

Deg<br />

Sat<br />

(%)<br />

Turners<br />

In Gaps<br />

(pcu)<br />

Turners<br />

When<br />

Unopposed<br />

(pcu)<br />

Turners In<br />

Intergreen<br />

(pcu)<br />

Total<br />

Delay<br />

(pcuHr)<br />

Av.<br />

Delay<br />

Per PCU<br />

(s/pcu)<br />

- - - - - - - - - 76.2% 472 0 2 16.1 - -<br />

- - - - - - - - - 76.2% 472 0 2 16.1 - -<br />

Greenock<br />

Road West<br />

Left Ahead<br />

Right<br />

Ferry Road<br />

North Right<br />

Left Ahead<br />

Greenock<br />

Road East<br />

Ahead Right<br />

Left<br />

Rossland<br />

Crescent Left<br />

Ahead Right<br />

O A 1 48 - 407 1967 803 50.7% 8 0 0 3.5 31.0 10.6<br />

O B 1 45 - 499 1727 662 75.4% 269 0 0 6.0 43.0 15.9<br />

O C 1 48 - 503 1948 660 76.2% 188 0 2 6.4 46.1 16.4<br />

O D 1 45 - 30 1832 702 4.3% 7 0 0 0.2 25.9 0.6<br />

C1 PRC for Signalled Lanes (%): 18.2 Total Delay for Signalled Lanes (pcuHr): 16.12 Cycle Time (s): 120<br />

PRC Over All Lanes (%): 18.2 Total Delay Over All Lanes(pcuHr): 16.12<br />

Mean<br />

Max<br />

Queue<br />

(pcu)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!