* ‘Load Survey’ & ‘Phasor Diag’ i.r.o detection tampering events<br />

* Lesser usage <strong>of</strong> Vehicle<br />

* All information <strong>of</strong> application packages will be at fingertips, so generation <strong>of</strong> MIS and o<strong>the</strong>r<br />

vital reports can be prepared in time, which will help administration to take decision on vital<br />

issues<br />

* IT system will increase <strong>the</strong> efficiency level <strong>of</strong> <strong>the</strong> base units (Circles & Supplies)<br />

* Less involvement <strong>of</strong> human interface<br />

New Project<br />

Online Remote Meter Reading & Monitoring : In a corporate level meeting held on 1/11/2006, <strong>the</strong><br />

policy <strong>of</strong> “Online Remote Metering” for Bulk consumers was accepted in principle by Board. As per<br />

advice <strong>of</strong> Board, a DPR (Detailed Project Report) <strong>of</strong> “Online Remote Meter Reading & Monitoring” has<br />

been prepared and sent to MoP, GoI for APDRP funding. After successful completion <strong>of</strong> Test Bed Project,<br />

300 Bulk consumers (10% <strong>of</strong> present strength) will be chosen for online “Remote Meter Reading” as a<br />

Pilot Project. Fur<strong>the</strong>r roll out <strong>of</strong> this project will be done after successful implementation <strong>of</strong> this pilot<br />

project.<br />

Annual Report 2006-2007<br />

119