Next part of the power scenario of the WBSEB comprises - Infraline
Next part of the power scenario of the WBSEB comprises - Infraline
Next part of the power scenario of the WBSEB comprises - Infraline
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
* ‘Load Survey’ & ‘Phasor Diag’ i.r.o detection tampering events<br />
* Lesser usage <strong>of</strong> Vehicle<br />
* All information <strong>of</strong> application packages will be at fingertips, so generation <strong>of</strong> MIS and o<strong>the</strong>r<br />
vital reports can be prepared in time, which will help administration to take decision on vital<br />
issues<br />
* IT system will increase <strong>the</strong> efficiency level <strong>of</strong> <strong>the</strong> base units (Circles & Supplies)<br />
* Less involvement <strong>of</strong> human interface<br />
New Project<br />
Online Remote Meter Reading & Monitoring : In a corporate level meeting held on 1/11/2006, <strong>the</strong><br />
policy <strong>of</strong> “Online Remote Metering” for Bulk consumers was accepted in principle by Board. As per<br />
advice <strong>of</strong> Board, a DPR (Detailed Project Report) <strong>of</strong> “Online Remote Meter Reading & Monitoring” has<br />
been prepared and sent to MoP, GoI for APDRP funding. After successful completion <strong>of</strong> Test Bed Project,<br />
300 Bulk consumers (10% <strong>of</strong> present strength) will be chosen for online “Remote Meter Reading” as a<br />
Pilot Project. Fur<strong>the</strong>r roll out <strong>of</strong> this project will be done after successful implementation <strong>of</strong> this pilot<br />
project.<br />