Next part of the power scenario of the WBSEB comprises - Infraline
Next part of the power scenario of the WBSEB comprises - Infraline
Next part of the power scenario of the WBSEB comprises - Infraline
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Out <strong>of</strong> <strong>the</strong>se 82 cases, in 23 cases estimates <strong>of</strong> service connection charges are under preparation, in 16<br />
cases estimates have been served but service connection charge awaited, in 14 cases service connection<br />
charges deposited but work orders are yet to be issued, in 29 cases work order issued and works are under<br />
execution.<br />
Tariff and allied matters<br />
The tariff order for <strong>the</strong> year 2006-07 for <strong>WBSEB</strong> is issued on 08.5.2006 by <strong>the</strong> Hon’ble Commission. The<br />
average cost <strong>of</strong> supply approved for <strong>the</strong> year 2006-07 is 319.07 paise / KWH<br />
Power Survey<br />
During <strong>the</strong> year under review, 17th Power Survey was reviewed with CEA for finalisation <strong>of</strong> <strong>the</strong> same.<br />
Compilation <strong>of</strong> Statistical Data<br />
The Central Statistical cell <strong>of</strong> <strong>the</strong> Board compiled various statistical reports for onward submission to CEA,<br />
ICRA etc.<br />
DETAILS OF PURCHASE OF ENERGY BY <strong>WBSEB</strong> DURING 2006-07<br />
Power Utilities Purchase <strong>of</strong> <strong>power</strong> MU Percentage<br />
2005-06 2006-07 Increase (+)/Decrease(–)<br />
Durgapur Projects Limited 300.913 165.616 – 44.96<br />
Damodar Valley Corporation 660.428 683.515 3.50<br />
Dishergarh Power Supply Co. Ltd. 163.773 200.239 22.27<br />
W.B.P.D.C.L 13341.403 13840.416 3.74<br />
N.T.P.C. Ltd. 4668.282 4531.538 – 2.93<br />
PTC (Chukha, Kurichhu) 614.769 733.888 19.38<br />
NHPC Rangeet Power 186.898 64.67 – 65.40<br />
PTC-peak 19.90 35.785 79.82<br />
NVVNL 0.000 15.646 0<br />
AEL - Peak 30.615 5.0750 – 83.42<br />
TPTCL 55.815 0 0<br />
CESC 20.092 0 0<br />
WBREDA 0.317 0.151 -52.37<br />
DVC Peak 310.158 263.018 – 15.20<br />
Govt. <strong>of</strong> Sikkim 0.204 0.205 0.49<br />
Electrosteel 1.252 47.362 3682.91<br />
Neora Hydro 0 2.776 0<br />
Total 20374.819 20904.081 2.60<br />
Highlight <strong>of</strong> Achievements<br />
1. New Centralised Bulk Connection 37 Nos.<br />
2. Energy sold in MU 7140.132<br />
3. Demand raised in Rs. Lakhs 283268.56<br />
4. Collection in Rs. Lakhs 277339.23<br />
134<br />
Annual Report 2006-2007