Energy Accounting for <strong>WBSEB</strong> Distribution System<br />

(Up to 11 KV BUS Technical Loss)<br />

Energys Input, Output & Loss at <strong>WBSEB</strong> Distribution System<br />

Energy (in MU)<br />

4.6% 4.5%<br />

3.8%<br />

3.6%<br />

3.2%<br />

3.9%<br />

3.5%<br />

3.3% 3.4% 3.3% 3.7% 4.5%<br />

A p r<br />

’06<br />

M a y<br />

’06<br />

J u n<br />

’06<br />

J u l<br />

’06<br />

A u g<br />

’06<br />

S e p<br />

’06<br />

Month<br />

Oct ’06<br />

N o v<br />

’06<br />

D e c<br />

’06<br />

J a n<br />

’06<br />

F e b<br />

’06<br />

M a r<br />

’06<br />

Energy Input (in MU) Energy Output (in MU)<br />

Energy Loss (in %)<br />

• DTR Metering Project<br />

Distribution Transformer Metering Project was started in 2005 for installation <strong>of</strong> 3 phase 4 wire CT<br />

operated static meters (0.5 class). Till date, 18000 Meters out <strong>of</strong> 26500 no (68%) have been installed<br />

covering 6 no Dist. Circles and 10 no Dist. Towns. After installation and commissioning <strong>of</strong> <strong>the</strong> meters,<br />

fur<strong>the</strong>r area <strong>of</strong> action covers data collection and report generation on monthly basis. Meter reading is<br />

being taken through MRI (Meter reading instrument) with LPR (Low Power Radio Frequency) communication<br />

facility and downloaded in <strong>the</strong> computer for fur<strong>the</strong>r analysis.<br />

• GIS Project<br />

Digital mapping, documentation <strong>of</strong> Power Network and identification <strong>of</strong> consumer in respect <strong>of</strong> feeding<br />

arrangement can be achieved through Geographical Information System (GIS). Power Network<br />

documentation shall comprise digitization <strong>of</strong> HT & LT Network. Electrical attributes <strong>of</strong> all <strong>the</strong> network<br />

elements shall be embedded in <strong>the</strong> s<strong>of</strong>tware so that same can be viewed from <strong>the</strong> GIS map. Provisions<br />

are <strong>the</strong>re to add, modify and remove <strong>the</strong> attributes also. Consumers connected with <strong>the</strong> network can be<br />

identified with pole no. DTR no etc.<br />

GIS is in operational at 45 nos. Electric Supplies and action has been taken to cover all <strong>the</strong> Gr. Electric<br />

supplies<strong>of</strong> <strong>WBSEB</strong> within next financial year.<br />

GIS can facilitate revenue monitoring, energy accounting and asset management along with load flow<br />

study.<br />

• Spot Billing<br />

Spot billing already implemented as pilot project in 03 no. Gr. Elect Supplies Chandannagar-I, Dasnagar<br />

and Garia.<br />

It was decided that this Project would be expanded to fur<strong>the</strong>r covers 100 nos. Electric Supply Stations<br />

within <strong>the</strong> financial Year 2007-2008.<br />