Energy Accounting for <strong>WBSEB</strong> Distribution System<br />
(Up to 11 KV BUS Technical Loss)<br />
Energys Input, Output & Loss at <strong>WBSEB</strong> Distribution System<br />
Energy (in MU)<br />
4.6% 4.5%<br />
3.8%<br />
3.6%<br />
3.2%<br />
3.9%<br />
3.5%<br />
3.3% 3.4% 3.3% 3.7% 4.5%<br />
A p r<br />
’06<br />
M a y<br />
’06<br />
J u n<br />
’06<br />
J u l<br />
’06<br />
A u g<br />
’06<br />
S e p<br />
’06<br />
Month<br />
Oct ’06<br />
N o v<br />
’06<br />
D e c<br />
’06<br />
J a n<br />
’06<br />
F e b<br />
’06<br />
M a r<br />
’06<br />
Energy Input (in MU) Energy Output (in MU)<br />
Energy Loss (in %)<br />
• DTR Metering Project<br />
Distribution Transformer Metering Project was started in 2005 for installation <strong>of</strong> 3 phase 4 wire CT<br />
operated static meters (0.5 class). Till date, 18000 Meters out <strong>of</strong> 26500 no (68%) have been installed<br />
covering 6 no Dist. Circles and 10 no Dist. Towns. After installation and commissioning <strong>of</strong> <strong>the</strong> meters,<br />
fur<strong>the</strong>r area <strong>of</strong> action covers data collection and report generation on monthly basis. Meter reading is<br />
being taken through MRI (Meter reading instrument) with LPR (Low Power Radio Frequency) communication<br />
facility and downloaded in <strong>the</strong> computer for fur<strong>the</strong>r analysis.<br />
• GIS Project<br />
Digital mapping, documentation <strong>of</strong> Power Network and identification <strong>of</strong> consumer in respect <strong>of</strong> feeding<br />
arrangement can be achieved through Geographical Information System (GIS). Power Network<br />
documentation shall comprise digitization <strong>of</strong> HT & LT Network. Electrical attributes <strong>of</strong> all <strong>the</strong> network<br />
elements shall be embedded in <strong>the</strong> s<strong>of</strong>tware so that same can be viewed from <strong>the</strong> GIS map. Provisions<br />
are <strong>the</strong>re to add, modify and remove <strong>the</strong> attributes also. Consumers connected with <strong>the</strong> network can be<br />
identified with pole no. DTR no etc.<br />
GIS is in operational at 45 nos. Electric Supplies and action has been taken to cover all <strong>the</strong> Gr. Electric<br />
supplies<strong>of</strong> <strong>WBSEB</strong> within next financial year.<br />
GIS can facilitate revenue monitoring, energy accounting and asset management along with load flow<br />
study.<br />
• Spot Billing<br />
Spot billing already implemented as pilot project in 03 no. Gr. Elect Supplies Chandannagar-I, Dasnagar<br />
and Garia.<br />
It was decided that this Project would be expanded to fur<strong>the</strong>r covers 100 nos. Electric Supply Stations<br />
within <strong>the</strong> financial Year 2007-2008.<br />