HYDEL PLANNING<br />
1.0. GENERATION & SENT-OUT FIGURES (IN ‘MU’) OF MAJOR HYDEL POWER STATIONS FOR<br />
2005-06 & 2006-07 UNDER <strong>WBSEB</strong><br />
Sl Name <strong>of</strong> <strong>the</strong> Year-wise Generation & Sent-out figures in ‘MU’<br />
No. Power Station 2005-06 2006-07<br />
with Capacity Generation Generation Generation Generation<br />
acheived sent out achieved sent out<br />
1. TEESTA CANAL FALL<br />
HEP<br />
PS-I : 22.5 MW (3x7.5)<br />
PS-II : 22.5 MW (3x7.5) 101.319 99.742 34.470 33.807<br />
PS-III : 22.5MW (3x7.5)<br />
2. RAMMAM HEP<br />
STAGE-II 196.822 196.224 231.153 230.431<br />
51MW (4x12.75)<br />
3. JALDHAKA HEP<br />
STAGE-I : 27MW (3X9) 170.166 169.386 147.143 145.917<br />
STAGE-II : 8MW (2x4)<br />
TOTAL 468.307 465.352 412.766 410.155<br />
2.0. GENERATION & SENT-OUT FIGURES (IN ‘MU’) OF SMALL HYDEL POWER STATIONS 2005-<br />
06 & 2006-07 UNDER <strong>WBSEB</strong><br />
Sl Name <strong>of</strong> <strong>the</strong> Year-wise Generation & Sent-out figures in ‘MU’<br />
No. Power Station 2005-06 2006-07<br />
with Capacity Generation Generation Generation Generation<br />
acheived sent out achieved sent out<br />
1. MUNGPOO-KALI KHOLA<br />
HEP 4.227 4.025 6.852 6.551<br />
3 MW (3x1.0)<br />
2. RINCHINGTON HEP<br />
2 MW (2x1.0) 6.360 5.954 4.534 4.518<br />
3. LITTLE RANGIT HEP<br />
2 MW (2X1.0) 2.919 1.993 7.205 7.193<br />
4. FAZI HEP<br />
2.448 MW 1.982 1.674 1.749 1.735<br />
(2X0.4+1X0.448+1X1.2)<br />
5. SIDRAPONG HEP<br />
0.6 MW (3X0.20)<br />
TOTAL 15.488 13.646 20.34 19.997<br />
18<br />
Annual Report 2006-2007