B. Approved plan & outside plan layouts during 2006-2007 for different capital works are as<br />

follows :<br />

Sl. Head <strong>of</strong> <strong>the</strong> scheme Approved outlay Revised Outlay<br />

No. Rupees in lakh Rupees in Lakh<br />

Plan Outside Plan Outside<br />

Plan<br />

Plan<br />

1. Generation 29175.00 2633.40 25552.00 681.34<br />

2. Renovation & Modernisation 0.00 2495.45 0.00 1003.44<br />

3. Transmission & Distribution<br />

a. Transmission 5745.00 23608.00 6307.40 25606.82<br />

b. Distribution 5000.00 25917.55 2881.06 31407.00<br />

c. Kutir Jyoti/Lok Deep – – – –<br />

4. Rural Electrification 6770.00 6750.00 9050.00 5075.00<br />

5. Load Despatch &<br />

Communication – 60.00 – 30.17<br />

6. Survey & Investigation – 40.79 – 13.32<br />

7. Miscellaneous – 465.00 – 748.00<br />

8. PFC/REC component – 15000.00 – 8597.26<br />

<strong>of</strong> APDRP Works<br />

Total 46690.00 76970.19 43790.06 73162.35<br />

Major Transmission Works :<br />

West Bengal Transmission System Project<br />

<br />

<br />

<br />

CP&ED prepared detailed design & engineering for Lines & Sub-stations <strong>of</strong> different voltage grade<br />

from 66 KV and above along with associated lines<br />

CP&ED arranged <strong>the</strong> joint inspection/testing <strong>of</strong> materials and equipment<br />

Vetted and approved <strong>the</strong> drawings <strong>of</strong> foundation and structure Land utilization Plan and Plan and<br />

Elevation <strong>of</strong> Switchyard layout etc.<br />

14 nos. <strong>of</strong> lines and 31 nos. <strong>of</strong> Sub-stations (<strong>of</strong> different voltage levels) including New Haldia 220/<br />

132 KV Sub-station under JBIC (Lot-I to Lot-IV) project, have been completed. Lo-I and Lot-II for<br />

transmission lines have already been closed. Field activity <strong>of</strong> Lot-III and IV for Sub-stations has<br />

been completed in totality. Efforts are being made for short closure <strong>of</strong> <strong>the</strong> said Project.<br />

Normal Transmission Works<br />

<br />

<br />

Design & Engineering <strong>of</strong> bulk <strong>power</strong> supply, traction <strong>power</strong> supply, normal augmentation and plan<br />

works have been done by CP&ED<br />

CP&ED prepared detailed design & engineering for new Sub-stations <strong>of</strong> different voltage grade<br />

from 66 KV & above along with associated lines<br />

Following new Sub-stations were commissioned during 2006-07 :<br />

Krishnanagar 220/132 KV (2×160 MVA Tr. capacity) on 27.03.07<br />

Coochbehar 132/33 KV (2×20 MVA Tr. capacity) on 20.07.06<br />

Annual Report 2006-2007<br />