- Page 2 and 3: In exercise of power under sub-sect
- Page 4 and 5: With the policy decision of Govt. o
- Page 6 and 7: CONTENTS Page Introduction 3 Func
- Page 8 and 9: INTRODUCTION West Bengal State Elec
- Page 10 and 11: FUNCTIONS OF THE BOARD THE BOARD DI
- Page 12 and 13: HIGHLIGHTS OF ACHIEVEMENTS : 2006-2
- Page 14: REVENUE RECEIPT & EXPENDITURE (Rs.
- Page 20: TRANSMISSION & DISTRIBUTION (LINES
- Page 23 and 24: HYDEL PLANNING 1.0. GENERATION & SE
- Page 25 and 26: HYDEL GENERATION The Hydel Wing is
- Page 27 and 28: OTHER ACTIVITIES : a) Industrial re
- Page 29 and 30: Plant Availability Factor : 99-00 0
- Page 31 and 32: RAMMAM HYDEL PROJECT, STAGE-II INTR
- Page 33 and 34: Yen (29,526 MRs) (base year October
- Page 35 and 36: WEST BENGAL TRANSMISSION SYSTEM PRO
- Page 37 and 38: Sl. Volt Name of Line Total Status
- Page 39 and 40: C. NEW SUB-STATIONS COMMISSIONED UN
- Page 41 and 42: F FEEDER BAY COMMISSIONED Sl. Name
- Page 43 and 44: B. NEW SUB-STATIONS UNDER CONSTRUCT
- Page 45 and 46: ERECTION OF NEW 33 KV MAINS PHYSICA
- Page 47 and 48: Contd. from P-30 DISTRICT WISE ACHI
- Page 49 and 50: NEW SERVICE CONNECTIONS EFFECTED TO
- Page 51 and 52: Sl. Name of the District Name of th
- Page 53 and 54: Sl. Name of the District Name of th
- Page 55 and 56: Sl. District Name of Voltage Existi
- Page 57 and 58: Sl. Name of District Name of the Di
- Page 59 and 60: APDRP CELL Accelerated Power Develo
- Page 61 and 62: PROGRESS OF VIRGIN MOUZAS ELECTRIFI
- Page 63 and 64: ANNEXURE -III SYNOPSIS OF VIRGIN MO
- Page 65 and 66:
CENTRAL MONITORING & INFORMATION CE
- Page 67 and 68:
R.M.R CELL The Cell is headed by an
- Page 69 and 70:
a) Jangalpara Gr.E/S. (Serampur Dis
- Page 71 and 72:
and coordination for data up dating
- Page 73 and 74:
CORPORATE PERSONNEL CELL Introductu
- Page 75 and 76:
PUBLIC RELATIONS DEPARTMENT The Dep
- Page 77 and 78:
Performance : Sl. Item of Activity
- Page 79 and 80:
STANDING SELECTION COMMITTEE - II T
- Page 81 and 82:
G. Issuance of No Demand Certificat
- Page 83 and 84:
8. Central Receipt and Despatch : R
- Page 85 and 86:
COMPARATIVE FINANCIAL STATEMENT (Rs
- Page 87 and 88:
PENSION, GRATUITY & GROUP INSURANCE
- Page 89 and 90:
Details of special Audit undertaken
- Page 91 and 92:
M/s. Bhatpara Tele. Exchange Rs. 2,
- Page 93 and 94:
INDUSTRIAL RELATIONS CELL The cell
- Page 95 and 96:
6. Redressal of Employees Grievance
- Page 97 and 98:
WBSEB appeared and made submissions
- Page 99 and 100:
Possession of land received by the
- Page 101 and 102:
In addition, 14 groups are engaged
- Page 103 and 104:
9) Cancer cases - 71 nos. (Employee
- Page 105 and 106:
SALT LAKE COMPLEX The department is
- Page 107 and 108:
OUTTURN OF S&LP UNITS WBSEB 2006-20
- Page 109 and 110:
CORPORATE VIGILANCE The Corporate V
- Page 111 and 112:
8. No. of cases dropped 3 Class-I -
- Page 113 and 114:
It is a good point to mention that
- Page 115 and 116:
Name of Courses No. of Participants
- Page 117 and 118:
DEPARTMENT OF SAFETY SUMMARY OF ACC
- Page 119 and 120:
SAFETY AWARENESS PROGRAMME FOR THE
- Page 121 and 122:
d) To introduce escalation method i
- Page 123 and 124:
* EDP Cell also generated various M
- Page 125 and 126:
ENERGY MANAGEMENT CELL Energy Manag
- Page 127 and 128:
CENTRAL PLANNING & ENGINEERING DEPA
- Page 129 and 130:
Folowing new Lines were commissione
- Page 131 and 132:
Compilation : A very important and
- Page 133 and 134:
POWER SOLD TO THE PERSON OTHER THAN
- Page 135 and 136:
Sl. Name of the Location of Supply
- Page 137 and 138:
Type of Industry No. of Total Contr
- Page 139 and 140:
Out of these 82 cases, in 23 cases
- Page 141 and 142:
The earnest money is adjusted with
- Page 143 and 144:
M/s Webel S. L. Energy Ltd. is sett
- Page 145 and 146:
New Industrial Consumers, Bulk cate
- Page 147 and 148:
Disposal of Scrap Materials lying a
- Page 149 and 150:
B) Bill Passing Cell (Party Claims)
- Page 151 and 152:
CENTRAL TESTING DEPARTMENT 1) Commi
- Page 153 and 154:
COMMUNICATION WING Communication Wi
- Page 155 and 156:
TESTING AND COMMISSIONING OF EPAX U
- Page 157 and 158:
Achievements 1. Computerisation hav
- Page 159 and 160:
STATE LOAD DESPATCH CENTRE The Stat
- Page 161 and 162:
LOAD MANAGEMENT HIGHLIGHTS 2006-200
- Page 163 and 164:
ANNEXURE-III CENTRAL LOAD DESPATCH,
- Page 165 and 166:
ANNEXURE-V STATE LOAD DESPATCH CENT
- Page 167:
ANNUAL REPORT 2006 - 2007 WEST BENG