B. NEW SUB-STATIONS UNDER CONSTRUCTION<br />
Sl. Description Present status Remarks<br />
No.<br />
<strong>of</strong> work progress<br />
1. Construction <strong>of</strong> a new 220/132 KV Sub-Stn. at Asansol Commissioned<br />
with 2 x 160 MVA, 220/132 KV + 2 x 50 MVA 132/33 KV on 01.05.2007<br />
Transformer and 6 + 7 + 8 Bays.<br />
2. Capacity <strong>of</strong> Transformers <strong>of</strong> 2 nos. 220/132 KV <strong>of</strong> Total no. <strong>of</strong><br />
320 MVA, 24 Nos. 132/33 KV <strong>of</strong> 561 MVA, 1 No. Transformer - 35.<br />
132/66 KV <strong>of</strong> 11.5 MVA, 2 nos. 66/11 KV <strong>of</strong> 8.3 MVA, Total capacity<br />
6 nos. 33/11 KV <strong>of</strong> 37.8 MVA to be enhanced addition - 938.<br />
during 2007-08.<br />
60 MVA. To be<br />
completed<br />
in 2007-08<br />
C. ACTUAL ACHIEVEMENT DURING 2006-07<br />
Sl. Description Present status Remarks<br />
No.<br />
<strong>of</strong> work progress<br />
1. Construction <strong>of</strong> a new 220/132 KV Sub-Stn. at Commissioned<br />
Krishnanagar with 2 x 160 MVA, 220/132 KV on 27.03.07<br />
Transformer and 6 + 2 Bays.<br />
2. The Capacity <strong>of</strong> Transformers <strong>of</strong> 9 nos. EHV Sub-Stn. 132/33 KV<br />
has been enhanced to 205.50 MVA (132/33 KV)<br />
Transformer<br />
& 22.6 MVA (33/11 KV).<br />
- 9 nos.<br />
33/11 KV<br />
Transformer<br />
- 2 nos.<br />
3. Krishnanagar - Satgachia 220 KVD/C Line. Commissioned<br />
on 21.07.06<br />
4. Construction <strong>of</strong> two nos. 220 KV Feeder Bays Commissioned<br />
at Satgchia 220 KV Sub-Stn. on 21.07.06<br />
5. Construction <strong>of</strong> 132 KV Line Bay at Debagram 132 KV Commissioned<br />
Sub-Stn. (<strong>WBSEB</strong>) and drawal <strong>of</strong> 132 KV S/C Tr. Line on 23.02.07<br />
from Debogram 132 KV Sub-Stn. (<strong>WBSEB</strong>) to<br />
Debogram 132 KV Traction Sub-Stn. (Railway) and<br />
construction <strong>of</strong> 132 KV Line Bay at Debogram 132 KV<br />
Traction Sub-Stn.<br />
38<br />
Annual Report 2006-2007