manual on management of drugs
manual on management of drugs
manual on management of drugs
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step 2<br />
Identify the stock available as at the date <strong>of</strong> preparati<strong>on</strong> <strong>of</strong> estimates.<br />
Determine the availability in m<strong>on</strong>ths based <strong>on</strong> the above forecasted<br />
m<strong>on</strong>thly requirement.<br />
Step 3<br />
Based <strong>on</strong> stock availability durati<strong>on</strong> in m<strong>on</strong>ths determined as above,<br />
identify the delivery <strong>of</strong><br />
1 st quarter/1 st lot <strong>of</strong> year - 2<br />
C<strong>on</strong>diti<strong>on</strong>:<br />
Acceptance <strong>of</strong> stock during the period from the date <strong>of</strong> stock<br />
c<strong>on</strong>sidered and end year should be <strong>on</strong>ly to build two m<strong>on</strong>ths buffer<br />
stock as at January <strong>of</strong> the following year (year - 2)<br />
Step 4<br />
Estimati<strong>on</strong> for the said year (Year - 2)<br />
C<strong>on</strong>diti<strong>on</strong>:<br />
Quantity estimated to build a two m<strong>on</strong>ths buffer stock as at January<br />
<strong>of</strong> year - 3<br />
based <strong>on</strong> forecasted m<strong>on</strong>thly requirement.<br />
Step 5<br />
Illustrated by an example for estimating year – 2 requirement<br />
is 14<br />
The anticipated stock durati<strong>on</strong> as at January <strong>of</strong> year - 2 is 1<br />
The number <strong>of</strong> m<strong>on</strong>ths from January Year –2 to February – Year –3<br />
Then request is for 14 –1 = 13.<br />
Hence the estimate for year - 02 is 13 x the Forecasted M<strong>on</strong>thly<br />
Requirement (FMR) ,<br />
Hence the estimate for year – 02 is 13x3,300 = 42,900units<br />
17