Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Initiate Ill reduction program and<br />
complete over 5/10 year period;<br />
assess PWWF based on results.<br />
0 Modify existing <strong>Blackburn</strong> WWTP<br />
to operate as storage basins.<br />
a Route all flow to Lansdowne Road<br />
WWT P.<br />
Pipeline route (m m) from Blackbum<br />
storage basins to Correctional<br />
Centre tiein.<br />
Assess conditionlcapacity of existing<br />
Mackus Road PS.<br />
@ Assess conditionlcapacity of existing<br />
sewage conveyance system through<br />
downtown area.<br />
a Assess impact of added sewage<br />
flow on Lansdowne Road WWTP<br />
/Ti<br />
LEGEND:<br />
------ Exist. Sanitary Collection Mains<br />
Blackbum Sanitary Collection Area<br />
City of Prince George<br />
ckburn <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
I<br />
OPTION 3<br />
Figure 4.3