19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Initiate Ill reduction program and<br />

complete over 5/10 year period;<br />

assess PWWF based on results.<br />

0 Modify existing <strong>Blackburn</strong> WWTP<br />

to operate as storage basins.<br />

a Route all flow to Lansdowne Road<br />

WWT P.<br />

Pipeline route (m m) from Blackbum<br />

storage basins to Correctional<br />

Centre tiein.<br />

Assess conditionlcapacity of existing<br />

Mackus Road PS.<br />

@ Assess conditionlcapacity of existing<br />

sewage conveyance system through<br />

downtown area.<br />

a Assess impact of added sewage<br />

flow on Lansdowne Road WWTP<br />

/Ti<br />

LEGEND:<br />

------ Exist. Sanitary Collection Mains<br />

Blackbum Sanitary Collection Area<br />

City of Prince George<br />

ckburn <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />

<strong>Treatment</strong> Options <strong>Study</strong><br />

I<br />

OPTION 3<br />

Figure 4.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!