Section 4.0 - <strong>Blackburn</strong> <strong>Treatment</strong> Options<br />

Miscellaneous<br />

Blackbum WWTP modifications to allow lagoons<br />

to operate as storage basins, LS 100,000<br />

Subtotat 1,165,000<br />

Contingencies (1 5 percent)<br />

EngineeringlAdminisWion (20 percent)<br />

GST (3 percent)<br />

TOTAL<br />

4.4 OPTION 4 - TRANSFER ALL FLOW < 2*ADWF TO LANSDOWNE<br />

ROAD WWTP AND USE THE EXISTING BLACKBURN WWTP TO<br />

TREAT FLOWS > 2*ADWF<br />

4.4.1 Outline<br />

In this option all flows up to 2*ADWF would be transferred &om the<br />

<strong>Blackburn</strong> sewage collection area for treatment at the Lansdowne Road<br />

WWTP. The existing sewage lagoons would be used only to treat wet weather<br />

flows > 2*AI)WF. A schematic representation of this option is presented in<br />

Figure 4.4. An It1 reduction program is to be i~tiated and completed to reduce<br />

the volume of wastewater being treated in the lagoons during wet weather and<br />

snowmelt conditions. The existing Mackus Road pumpstation would be<br />

upgraded and a new purnpstation constmcted to handle excess flow<br />

>2*ADWF. It is believed that the Lansdowne Road WWTP has sufficient<br />

capacity to handle the projected future 2*ADWF hydraulic and BODjtTSS<br />

loadings fkom the Blackbum sewage collection area. All wet weather flow ><br />

2*ADWF will be pumped to the existing Blackbum WWTP for treatment.<br />

Key activities or capitat works associated with this option are as follows:<br />

Implement VI reduction program.<br />

<strong>Upgrade</strong> Mackus Road purnpstation to handle project4 increased flows.<br />

All dry weather flows < 2'ADWF are to be pumped to Lansdowne Road<br />

WWTP; all wet weather flows > 2*ADWF are to be pumped to <strong>Blackburn</strong><br />

WWTP.<br />

Construct trunk gravity sewer and/or forcemain to transfer all flows<br />