Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />
Condition and capacity of the existing Mackus Road pumpstation must be<br />
evaluated.<br />
Details for pipeline routes for transfening Blackbum sewage flows to<br />
Lansdowne Road WWTP must be evaluated.<br />
Ammonia toxicity issue addressed at Lansdowne Road WWTP.<br />
43.2 Design Information<br />
Population<br />
ADWF, m3/d<br />
PWWF, m3/d<br />
Pipework<br />
Gravity sewermain hm<br />
the existing Blackbum WWTP site to<br />
the Regional Correctional Centre tie-in<br />
Diameter, mm<br />
Length, m<br />
Sanitary sewer syphon hm Yellowhead Bridge connecting to<br />
downtown sewage collection system<br />
Diameter, mm<br />
Length, m<br />
Gravity sewer to intersection of 15" Ave. and Taylor Drive;<br />
construct new manhole<br />
Diameter, mm<br />
Length, m<br />
Gravity sewer along lSfh ~ ve. from Taylor Drive to Birch St.;<br />
connect to 525 diameter sewer<br />
Diameter, mm<br />
Length, m<br />
Pompstation<br />
<strong>Upgrade</strong>MackusRoadPSforPWWFcapacity<br />
Miscellaneous<br />
Modifications to Blackbum WWTP to operate as storage basin<br />
43.3 Cost Estimate<br />
Pipework<br />
200 syphon, S2OOJm<br />
300 gravity sewer<br />
Blackbum, $160/m<br />
Downtown, S250/m<br />
Pumpstation<br />
Mackus Road PS, LS