Section 5.0 -Evaluation of Options<br />

Subsequent to the ranking results developed in Form 5.3, the participants<br />

completed Form 5.4, by using the pair-wise comparison technique, with the<br />

scores modified by incorporating the weighting results &om Form 5.1. The<br />

overall results were similar to the r;lting/weighting exercise as these results<br />

indicated that the preferred options are Option 1 (score 46.9) and Option 2<br />

(score 44.2), and the least preferred option is Option 7 (score 10.8).<br />

The similarity in the results provides a level of confidence that the decision<br />

techniques are robust. As Options 1 and 2 scored the highest in both<br />

techniques, discussion at the workshop then concentrated on identifying the<br />

preferred option for recommendation. As identified in the earlier sections both<br />

options achieve similar objectives primarily through alternative flow transfer<br />

routes. Consensus at the workshop was that the certainty of the route from<br />

Option 1 was greater than that for Option 2, and the construction of the Option<br />

1 alignment was likely to have more potential to encourage further<br />

development.<br />

The recommendation of the Decision Workshop members based on the ranking<br />

and comparison results is therefore to pursue Option 1.