Section 4.0 - <strong>Blackburn</strong> <strong>Treatment</strong> Options<br />

Gravity sewer to intersection of 15" Ave. and Taylor Drive;<br />

construct new manhole<br />

Diameter, mrn 300<br />

Length, m 100<br />

Gravity sewer along 15' Ave. from Taylor Drive to Birch St.;<br />

connect to 525 diameter sewer<br />

Diameter, mm 300<br />

Length, m 180<br />

Pumpstation<br />

<strong>Upgrade</strong> Mackus Road PS for 2*AD WF capacity<br />

w<br />

Supply and install PS and construct overflow wet well to handle<br />

flows > 2 * m<br />

Miscellaneons<br />

Modifications to existing BIackbwn WWTP to provide primary<br />

treatment for flows > 2*ADWF<br />

4.4.3 Cost Estimate<br />

Pipework<br />

200 forcemain, $180/m<br />

w 200 syphon, $200/m<br />

300 gravity sewer<br />

<strong>Blackburn</strong>, $l6O/m<br />

Downtown, $250/m<br />

Pumpstation<br />

Mackus Road PS, LS<br />

Mackus Road Overflow PS, LS<br />

Miscellaneous<br />

Blackbum WWTP modifications, LS<br />

Subtotal<br />

Contingencies (1 5 percent)<br />

Engineering/Adminishtion (20 percent)<br />

GST (3 percent)<br />

TOTAL<br />

4.5 OPTION 5 - TRANSFER ALL FLOW < 2*ADWF TO LANSDOWNE<br />

ROAD W TP AND USE THE EXISTING BLACKBURN WWTP TO<br />

TREAT FLOWS > 2*ADWF<br />

4.5.1 Outline<br />

In this option all flows up to 2*ADWF would be transferred from the<br />

<strong>Blackburn</strong> sewage collection area for treatment at the Lansdowne Road<br />

WWTP. The existing sewage lagoons would be used only to treat wet weather