Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Section 5.0 -Evaluation of Options<br />
FORM 5.1<br />
Relative Weightings of the Decision Criteria<br />
Groupings to be Used in the Evaluation<br />
Cost Criteria<br />
Technical Criteria<br />
Operational Criteria<br />
Environmental and Aesthetic Criteria<br />
Total 10