Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Initiate llt reduction program and<br />
complete over 511 0 year period;<br />
assess PWWF based on results.<br />
Modify existing Blackbum WWTP<br />
to operate as storage basins.<br />
Route all flow to Lansdowne Road<br />
WWTP.<br />
Pipeline route (m m m) from <strong>Blackburn</strong><br />
storage basins to Correctional<br />
Centre tie-in.<br />
Assess conditionlcapacity of existing<br />
Mackus Road PS.<br />
Assess conditionlcapacity of existing<br />
sewage conveyance system through<br />
downtown area.<br />
Assess impact of added sewage<br />
flow on Lansdowne Road WWTP<br />
capacityloperation.<br />
I.<br />
I/<br />
I.<br />
li<br />
i I<br />
!<br />
LEGEND:<br />
! ------ Exist. Sanitary Collection Mains<br />
Blackbum Sanitary Collection Area<br />
City of Prince George<br />
<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
OPTION 3<br />
Figure 4.3