Section 5.0- Evaluation of Options<br />

Effect on Surrounding Area<br />

The potential for degradation of the surrounding area (e.g. the receiving<br />

water quality, or transfer pipeline routes) under normal and upset operating<br />

conditions.<br />

Odonr PotentiallAir Emission<br />

The potential for malodorous gas release from a system under normal and<br />

upset conditions.<br />

VisuaVNoiselTraffic<br />

A measure of the visual obtrusiveness of the system or facility, the<br />

magnitude of noise generation and the amount of buck traffic associated<br />

with the system.<br />

The cost criteria for the various options have been developed within this<br />

document. In cases where there is no significant difference in the life cycle<br />

costs of two options, the decision regarding the preferred option must be based<br />

on the non-economic criteria listed above. During the Decision Workshop, the<br />

key project elements were evaluated using both the economic and noneconomic<br />

criteria by the technical and administrative personnel from the City,<br />

a representative from MOE and key project team members from the Reid<br />

Crowther team.<br />

5.2 EVALUATION TECHNIQUES<br />

5.2.1 Introduction<br />

There are a variety of techniques that can be used to assist decision-makers<br />

with selacting options. The most usefd technique nil1 depend on the nature<br />

and magnitude of the trade-offs identified and the stakeholders involved.<br />

There are a variety of recognized technical methods available, which vaty<br />

considerably in complexity and include:<br />

Holistic assessment<br />

Options are ranked based on structural information, but no formal decision<br />

model. Trade-offs are implicit using this technique which could be<br />

considered to be too judgmental for this project.<br />

Pair-wise comparison<br />

Each of the criteria b m every option is paired with all other options and<br />

individually evaluated or scored based on which perfoms best.