19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Initiate Ill reduction program and<br />

complete over 5110 year period;<br />

assess PWWF based on results.<br />

0 Maintain existing <strong>Blackburn</strong> WWTP<br />

for flows > 2(ADWF).<br />

Route all flow to <strong>Blackburn</strong> WWTP<br />

using existing pipeline.<br />

Route flows s 2(ADWF) to Lansdown<br />

Road WWTP for treatment.<br />

Pipeline route (= =) from Blackbun<br />

WWTP to Correctional Centre tie-in.<br />

8 Provide primary treatment for flows<br />

> 2(ADWF) at Blackbum WWTP and<br />

discharge to Fraser River.<br />

Assess conditionlcapacity of existin:<br />

Mackus Road PS.<br />

Assess conditionkapacity of existins<br />

sanitary conveyance system through<br />

downtown area.<br />

Assess impact of added 2(ADWF)<br />

sewage flow on Lansdowne Road<br />

WWTP capacityloperation.<br />

LEGEND:<br />

. - - - - - - Exist. Sanlary Collection Mains<br />

Blackbum Sanitary Collectjon Area

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!