[<strong>Blackburn</strong> ---<br />
WWTP <strong>Treatment</strong> Options 1 -- .- I I<br />
Option 5 1 1<br />
blaintain <strong>Blackburn</strong> WWTP for Flows>2*ADWFmraosfer ElowscZ*ADWF to Lansdowne Road WWTP<br />
I I I I I I<br />
Notes:<br />
Annual O&M oasi for <strong>Blackburn</strong> sewage lagoons 1999-2007 is $45.000-$56,571<br />
Annual O M cosl for <strong>Blackburn</strong> sewage lagoons for PWWF treatment 2008-2024 is $20,000<br />
incremental O&M cost lor treating <strong>Blackburn</strong> wastewater at Lansdowne Road WWTP 2008-2024<br />