19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

[<strong>Blackburn</strong> ---<br />

WWTP <strong>Treatment</strong> Options 1 -- .- I I<br />

Option 5 1 1<br />

blaintain <strong>Blackburn</strong> WWTP for Flows>2*ADWFmraosfer ElowscZ*ADWF to Lansdowne Road WWTP<br />

I I I I I I<br />

Notes:<br />

Annual O&M oasi for <strong>Blackburn</strong> sewage lagoons 1999-2007 is $45.000-$56,571<br />

Annual O M cosl for <strong>Blackburn</strong> sewage lagoons for PWWF treatment 2008-2024 is $20,000<br />

incremental O&M cost lor treating <strong>Blackburn</strong> wastewater at Lansdowne Road WWTP 2008-2024<br />

I I I I I I