Section 4.0 - <strong>Blackburn</strong> <strong>Treatment</strong> Options<br />

Option<br />

7a<br />

7b<br />

Capital Cost<br />

1999<br />

1,785,000<br />

2,315,000<br />

NT'V<br />

Capital Cost<br />

1,155,000<br />

1,495,000<br />

NPV<br />

O&M Costs<br />

1,840,0000<br />

1,840,0000<br />

XPV<br />

Total<br />

2,995,000<br />

3,335,000<br />

The above life cycle cost summary shows that the NeV of Options 1,2, 3,4, 5,<br />

and 6a are all within approximately 20 percent of each other, with Option 2<br />

(decommission Blackbum WWTP and transfer all flows by gravity sewer to<br />

the Lansdowne Road WWTP) having the lowest overall cost. All options<br />

involving the installation of a mechanical secondary treatment plant at the<br />

<strong>Blackburn</strong> site (Options 6b, 7a and 7b) have a significantly higher cost than the<br />

flow transfer options.