Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />

4.6.3 Cost Estimate<br />

Lagoon System Without RBCYs<br />

Sitework<br />

Excavationberm construction, LS<br />

Manholes/chambers/pipes, LS<br />

Equipment<br />

Headworks, lagoons, chambers, LS<br />

Mechanical<br />

Headworks, lagoons, chambers, LS<br />

ElectricallInstrumeotation<br />

Headworks, lagoons, chambers, LS<br />

MisceUaneous<br />

Pumpstation<br />

Mackus Road PS, LS<br />

Subtotal<br />

Contingencies (15 percent)<br />

Engineering/Administration (20 percent)<br />

GST (3 percent)<br />

Total (without RBC)<br />

Lagoon System with RBC's for Nitrification<br />

The following listing of costs is the extra capital cost requird to include a<br />

nitrifiying R8C process at lagoon effluent temperature of 4OC.<br />

Structural<br />

TanklFRP covers, LS<br />

Equipment<br />

RBC's<br />

Mechanical<br />

Interconnecting pipework, etc.<br />

ElectricallInstrumeotation<br />

RBC motors and controls<br />

Miscellaneous<br />

Subtotal @BC)<br />

Subtotal (Lagoons)<br />

Contingencies (15 percent)<br />

Engineering/Administration (20 percent)<br />

GST (3 percent)<br />

Total (with RBC)