Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Initiate Ill reduction program and<br />
complete over 5110 year period;<br />
assess PWWF based on results.<br />
0 Maintain existing <strong>Blackburn</strong> WWTP<br />
for flows > 2(ADWF).<br />
Route Rows s 2(ADWF) to Lansdowne<br />
Road WIKTP.<br />
Pipeline route (<br />
m) from<br />
Mackus Road PS to Correctional<br />
Centre tiein.<br />
Route flow > 2(ADWF) to <strong>Blackburn</strong><br />
WWTP using existing pipeline;<br />
provide primary treatment and<br />
discharge to Fraser River.<br />
Road<br />
Assess conditionlcapacity of existing<br />
Mackus Road PS; provide PS to pump<br />
flows > 2(ADWF) to <strong>Blackburn</strong> WWTP.<br />
Assess conditionlcapacity of existing<br />
sewage conveyance system through<br />
downtown area.<br />
Assess impact of added 2(ADWF)<br />
sewage flow on Lansdowne Road<br />
WWTP capacityloperation.<br />
I<br />
LEGEND:<br />
. - - - - - - Exist. Sanitary Collection Mains<br />
Blackbum Sanitary Collection Area<br />
City of Prince George<br />
Black ;bum <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
OPTION 4<br />
Figure 4.4