19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Initiate Ill reduction program and<br />

complete over 5110 year period;<br />

assess PWWF based on results.<br />

0 Maintain existing <strong>Blackburn</strong> WWTP<br />

for flows > 2(ADWF).<br />

Route Rows s 2(ADWF) to Lansdowne<br />

Road WIKTP.<br />

Pipeline route (<br />

m) from<br />

Mackus Road PS to Correctional<br />

Centre tiein.<br />

Route flow > 2(ADWF) to <strong>Blackburn</strong><br />

WWTP using existing pipeline;<br />

provide primary treatment and<br />

discharge to Fraser River.<br />

Road<br />

Assess conditionlcapacity of existing<br />

Mackus Road PS; provide PS to pump<br />

flows > 2(ADWF) to <strong>Blackburn</strong> WWTP.<br />

Assess conditionlcapacity of existing<br />

sewage conveyance system through<br />

downtown area.<br />

Assess impact of added 2(ADWF)<br />

sewage flow on Lansdowne Road<br />

WWTP capacityloperation.<br />

I<br />

LEGEND:<br />

. - - - - - - Exist. Sanitary Collection Mains<br />

Blackbum Sanitary Collection Area<br />

City of Prince George<br />

Black ;bum <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />

<strong>Treatment</strong> Options <strong>Study</strong><br />

OPTION 4<br />

Figure 4.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!