Section 2.0 - UI Mitigation Measures<br />

Infiltration can enter a sewer system through deficiencies or cracks in 3 categories of<br />

the sewer line: connections, in-street pipes including joints, and manholes. Infiltration<br />

that can be expected to result from each of the 3 categories is calculated on a mmdiameter-m<br />

basis. Other assumptions involved in the proportioning of infiltration<br />

amongst pipes, manholes, and connections is the lower construction standards of<br />

connection installment (45 percent), and the 7 mt10 m split of municipaVprivate<br />

connection length.<br />

Table 2.2a calculates that of the 33 percent of III that is infiltration, approximately 21<br />

percent is from pipes, 3 percent from manholes, 4 percent from municipal connections,<br />

and 5 percent from private connections.<br />

Table 2.2b and Table 2.2~ calculate the percent infiltration reduction required from<br />

pipes including joints, manholes, and connections in order to reach the required yearly<br />

reduction as previously described in Table 2.1. The amount of physicaf rehabilitation<br />

is based on the assumption that grouting a section of pipe will only reduce its<br />

contribution to infiltration by a maximum of 75 percent. Therefore, the percent of<br />

rehabilitation must be higher in order to achieve the required percent of infiltration<br />

reduction. For example, during the first year (2000) of the 5 year plan, about 6 percent<br />

of the infiltration in pipes must be reduced. This means that approximately 8 percent<br />

ofpipes must be grouted to achieve the required reductions in infiltration.<br />

Table 2.3a and Table 2.3b estimates the cost of rehabilitation based on the grouting of<br />

each sewer element. The cost of grouting is assumed as follows:<br />

Pipes, $/m<br />

Manholes, $/unit<br />

Connections, $/m<br />

The total cost for the 5 year and 10 year rehabilitation plans are $1,580,000 and<br />

$1,120,000 respectively. The Net Present Value (NPV) is calculatd in Table 2.4.<br />

Based on an annual discount rate of 6 percent, the NPV for the 5 and 10 year plans are<br />

$1,319,000 and 5815,000 respectively.<br />

The 10 year plan requires less work to be done as it is based on the percentage of flow<br />

reduction each year to the previous year. Therefore, the overall capital cost is<br />

$460,000 less than the 5 year plan. However, it should be noted, that by committing<br />

to a 10 year plan, the City of Prince George is not meeting the 2 x ADWF criteria for<br />

the Blackbum sewerage area for an additional 5 years. This makes the 5 year plan a<br />

flow based benefit plan, and the 10 year plan a cost based benefit plan.