Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />

Condition and capacity of the existing Mackus Road pumpstation must be<br />

evaluated.<br />

Details for pipeline routes for transferring Blackbum sewage flows to<br />

Lansdowne Road WWTP must be evaluated.<br />

Ammonia toxicity issue addressed at Lansdowne Road WWTP.<br />

4.3.2 Design Information<br />

Population<br />

ADWF, m3/d<br />

PWWF, m3/d<br />

Pipework<br />

Gravity sewermain from the existing Blackbum WWTP site to<br />

the Regional Correctional Centre tie-in<br />

Diameter, mm<br />

Length, m<br />

Sanitary sewer syphon from Yellowhead Bridge connecting to<br />

downtown sewage collection system<br />

Diameter, rnrn<br />

Length, m<br />

Gravity sewer to intersection of 15' Ave. and Taylor Drive;<br />

construct new manhole<br />

Diameter, mm<br />

Length, m<br />

Gravity sewer along 1 5 Ave. ~ from Taylor Drive to Birch St.;<br />

connect to 525 diameter sewer<br />

Diameter, rnm<br />

Length, m<br />

Pumpstation<br />

<strong>Upgrade</strong> Mackus Road PS for PWWF capacity<br />

MisceIlaneous<br />

Modifications to Blackbum WWTP to operate as storage basin<br />

4.3.3 Cost Estimate<br />

Pipework<br />

200 syphon, $200/m<br />

300 gravity sewer<br />

Blackbum, $160/m<br />

Downtown, $250/m<br />

Pumpstation<br />

Mackus Road PS, LS